Compare shipping container bars for sale by the work included and the drinks you plan to serve. Decide whether you need a shell to finish or a fitted bar, then prepare a quote request around refrigeration, dispensing, washing and site connections.
Design a container bar for pouring, washing and replenishment
A bottle-service hatch, a draught-beer bar and a cocktail station need different equipment and different movements. Start with what you serve, how customers order and how stock reaches the bar during a busy period. Refrigeration and glasswashing should be part of the plan from the beginning.
Compare three layouts below: a compact serving unit, a longer mixed-drinks bar, and a separate service unit and cellar. They show possible ways to divide the work. Plan the final bar, customer area and venue requirements together.
How to use these concept plans
The plans divide an approximate outside footprint: 6.06 × 2.44 m for a 20ft module and 12.19 × 2.44 m for a 40ft module. The zones are not finished room dimensions. Structure, lining, services and partitions take up space. Before fabrication, get a measured design showing doors, equipment clearances, access and exits for your project.
Explore three ways to arrange the space
Concept layouts for comparing options. Develop the selected idea into a dimensioned design with your fabricator and project designer.
20ft bottle and draught service bar
A compact service module with chilled stock close to the counter and a defined washing area. Plan the draught equipment with its refrigeration and line-cleaning access rather than adding taps to an otherwise finished shell. Customers order outside; the restock door belongs away from the queue.
1 × 20ft
Swipe across the plan to explore it on a small screen.Stock access is at the end; the serving hatch is in the pouring zone. Sink and tap symbols distinguish washing from dispensing.Open / download this plan
01 · Stock & chill
02 · Pouring
03 · Wash-up
Equipment and connections to resolve
Refrigeration, dispensing and water-heating connections
Potable water and wastewater for washing
Safe siting of dispensing-gas equipment where used
Ask your quote to cover
Bottle, can and draught menu
Keg and refrigeration arrangement
Glass or disposable serviceware
Stock delivery and restock route
Mark operator positions, open fridge doors and the space needed to move a full keg or crate.
Customer waiting, seating, toilets, rubbish and event boundaries are outside the module footprint.
Decide where the kegs live before choosing the tap position and finished counter.
Separate mixed-drink preparation from straightforward pouring and collection. Reserve the ice, garnish, chilled ingredients and washing positions together with the work surfaces. The extra length is useful when it removes repeated crossings; it should not become a long walk between every part of a drink.
1 × 40ft
Swipe across the plan to explore it on a small screen.Customer collection faces the pour/pickup zone. Glasswashing stays at the opposite end of the drink-making line.Open / download this plan
01 · Stock & chill
02 · Cocktail prep
03 · Pour & pickup
04 · Glasswash
Equipment and connections to resolve
Ice-maker supply and drainage if included
Electrical and refrigeration schedule
Hot water and wastewater for selected glasswashing equipment
Ask your quote to cover
Cocktail preparation steps and garnish storage
Ice made on site or delivered
Glass-return and waste routine
Counter segments and point-of-sale positions
Check mixing, pickup and glass returns together, with the selected under-counter equipment drawn at its actual size.
Place the public counter, queue and glass-return position within the larger venue plan.
Keep the most frequent drink tasks together, and give returned glassware a route that does not take over pickup.
A public service module is paired with a separate stock and support module. This can help when the venue needs more refrigeration or a place to handle empty kegs and deliveries. Decide whether the second unit is dry storage, chilled storage or a fitted cellar; those are different construction and equipment scopes.
2 × 20ft
Swipe across the plan to explore it on a small screen.The guest-facing openings face away from the stock module. The dashed link marks a staff-transfer route; refrigeration and dispensing lines are separate specifications.Open / download this plan
01 · Order & pour
02 · Cocktail prep
03 · Pickup
04 · Chilled stock
05 · Dry & returns
06 · Wash-up
Equipment and connections to resolve
Defined service connections to both units
Insulation and refrigeration for any chilled module
Draught-line route, cleaning access and condensate management
Ask your quote to cover
Cellar function and operating temperatures required
Equipment and keg transport between units
Independent units or a designed physical link
Who designs and commissions the dispensing system
Set the storage temperature, keg route and dispensing-line route with the refrigeration and draught-system suppliers.
Final spacing and any protected staff route must accommodate deliveries and separate them from guests.
A cold store and a general storage container are not interchangeable; describe what the second module must do.
How to convert a container into a serviceable drinks bar
Map drinks, full stock and glass returns before setting the counter. Coordinate the hatch, refrigeration, ice, water, drainage and any dispensing lines as one working bar.
Before ordering materials or cutting steel
Inspect the shell, floor and old coatings; identify unknown contents, residues and previous linings before disturbance.
Decide bottle/can, draught and cocktail functions and obtain refrigeration/dispensing equipment drawings.
Agree the venue’s utilities, licensing/operating review, gas-storage strategy where used and restocking access.
See the build sequence
Swipe across the drawing on a small screen.
Name who installs and tests the dispensing system, and who provides its power, cooling and drainage.
Quantities follow the chosen dimensions, openings and equipment. Measure the final design before buying; this is a selection guide, not a fixed shopping basket.
Materials and how to estimate quantities
How much to allow
Choose for your design
Designed hatch, door frames and connections
Carry the serving opening and staff entrance.
Use the approved opening and connection schedule.
Include support for counters and any attached canopy in the structural brief.
Weather seals, flashings and coating system
Protect altered steel and keep water outside.
Measure opening perimeters, junctions and prepared surface area.
Match coatings, sealants and retained finishes.
Floor, framing, insulation and control layers
Form the bar’s thermal and moisture enclosure.
Measure actual surfaces and retained service zones.
A general insulated shell is not a specified beer cellar. Compare mineral wool in a supported frame with a specified rigid PIR-board or panel system only where its fire/heat performance and condensation design suit the use; follow the selected system as a whole.
Bar counter, splashbacks and washable linings
Support pouring and mixed-drink preparation.
Template appliances, drip trays, sinks, ice wells and finishing positions.
Select load, cleaning and moisture suitability for each zone.
Commercial floor and coved/junction details
Handle drink spills and the agreed cleaning process.
Measure area, perimeter, drains and thresholds.
Select for the actual substrate and wet exposure; do not assume a decorative plank is a wet-area system.
Refrigeration and ice equipment
Keep stock and ingredients in their specified conditions.
Use the signed equipment and ventilation schedule.
Include condensate, servicing and replacement access.
Draught components where selected
Connect the defined keg-to-tap system.
Dispensing specialist specifies line runs, cooling, gas equipment and connections.
Select as a coordinated system; do not buy tubing or regulators by appearance.
Water, waste, hot-water and electrical services
Supply washing, ice and refrigeration.
Take routes and quantities from the coordinated service plan.
Qualified trades size supplies and protection from actual appliances.
Stock restraints, locks and transport fittings
Keep storage and movable-bar equipment controlled.
Count fixtures and restraints from the stock/relocation plan.
Specify separately for static operation and repeated transport.
Tools and equipment
Tape, templates and marking tools
Map stock, pouring, washing and opening positions.
Camera, inspection light and levels
Record shell, floor and installed alignment.
Cold-cutting saw/nibbler, plasma cutter or abrasive grinder, as selected in the fabrication method
Trained fabricators cut and frame the approved openings. The competent team selects the method for the steel/coating condition, restraints, sparks and fume controls; deburr accessible cut edges before coating.
Coating tools and inspection gauges
Prepare and protect modified steel.
Counter/panel tools and drill/driver
Fit backing, counters, trims and accessible equipment supports.
Floor-system tools and sealant applicator
Complete spill-prone floor and wall junctions.
Trade leak, electrical and refrigeration instruments
Qualified installers test their completed systems.
Dispensing startup and cleaning equipment
Specialist commissions the chosen draught system and trains operators.
Work through the build in this order
01 Inspect the shell and check previous use
Old residues and hidden wet floors are poor foundations for a bar.
Record floor damage, corrosion, leakage and previous penetrations.
Assess unknown coatings, residues and suspect old materials before removal or hot work.
Check before the next stage: Agree and record repairs and cleaning before fabrication.
02 Lay out pouring, mixing and glass return
Returned glassware and replenishment should not take over pickup.
Mock up taps, cocktail preparation, ice, washing and point of sale using actual appliance sizes.
Draw full and empty keg/crate routes and the staff entrance away from the public queue.
Check before the next stage: The layout includes open fridge doors and room to move the stock.
03 Plan structural work around the bar equipment
Tap location affects lines, cooling, counter supports and maintenance.
Set the hatch, counter, door and any canopy from the agreed structural design.
Dispensing and refrigeration suppliers confirm equipment, service routes and any gas-ventilation/monitoring strategy required by the specific installation.
Check before the next stage: One coordinated plan identifies supplier boundaries and operating review responsibilities.
04 Form the supported openings
Cut-outs and frames must be considered together.
Fabricators restrain panels and follow the approved temporary-support, cutting and connection sequence.
Inspect frame dimensions and connections before closing them behind counters.
Check before the next stage: Opening and connection checks are recorded.
Work to coordinate with the relevant trade: Only the structural/fabrication team defines framing and cut sequence; no generic hatch size determines a safe steel profile.
05 Coat and weather-seal the shell
Water behind refrigeration and counters can remain hidden.
Restore protection at welds and edges using the specified preparation and coating system.
Install hatch, door, flashings and seals, then check water entry and operation.
Check before the next stage: The shell is dry, coating work is recorded and closures open and close freely.
06 Fit insulation, lining and equipment supports
Cold equipment, ice and washing create different junction conditions.
Install the repaired floor and agreed backing for counters, refrigeration and dispensing supports; mark maintenance panels before insulation.
Measure every bay/reveal and trial-fit the selected insulation pieces; cut with product-appropriate tools rather than forcing offcuts into gaps.
Fit mineral wool without unintended compression or use the designed rigid-board system with its joint/facing details. Complete the specified air/moisture layer with compatible tapes/seals.
Check the insulation and seals around cooling equipment, the hatch and service openings. Photograph them before covering with lining.
Check before the next stage: Finished space accommodates the supplier’s equipment and service envelopes.
07 First-fix water, drainage, power and dispensing routes
Hidden routes should be tested before finishing panels.
Trades install and test washing, hot-water, ice, electrical and condensate connections.
Dispensing contractor installs the selected line/cooling and gas system, with safe isolation and cylinder arrangements as designed.
Check before the next stage: Services are identified, tested and photographed before closure.
Work to coordinate with the relevant trade: Gas pressure, regulators, line balancing and gas-risk controls are equipment-specific specialist work.
08 Complete washable counters and spill-prone junctions
Cleaning performance depends on the joints and substrate.
Check dry, sound substrates; dry-fit and number the panels around the drip tray, washing station and ice equipment.
Apply the specified adhesive/fasteners and trims, leaving the selected panel system’s movement allowance before sealing its wet junctions.
Install the chosen commercial floor with its cove/joint and threshold details; observe curing instructions before wheeling refrigeration into place.
Finish sink, ice-well and service penetrations, then check that valves, traps and cleaning connections remain reachable behind the joinery.
Check before the next stage: No trapped cleaning gap or inaccessible valve is hidden by fixed joinery.
09 Set up refrigeration and the bar equipment
Startup is different from merely connecting a plug or a keg.
Install fridges, ice, washing and dispensing equipment to their selected manuals.
Have the dispensing specialist commission cooling and flow and explain the approved cleaning routine.
Check before the next stage: Installed equipment IDs and startup/cleaning records match the schedule.
10 Run service and cleaning before opening
The bar must work while staff replenish and wash.
Simulate mixed orders, a keg/crate replacement, glass return and waste removal.
Check leaks, drainage, refrigeration, isolation and closure; hand over defects and operating responsibilities.
Check before the next stage: Staff demonstrate closing, cleaning and safe isolation using the final fit-out.
Mistakes that create rework
Designing taps before the keg location
The line route and cooling need coordination. Fix the stock and dispensing layout before drilling the finished counter.
Treating a drinks-gas cylinder as ordinary stock
Gas installations need suitable equipment, a secure position and safety checks. Include this work in the specialist's agreed tasks.
Forgetting the dirty-glass route
A successful pouring station can still be blocked by returned glasses. Give washing and returns a deliberate place.
Checks before putting the space into use
As-built stock, counter and service layout.
Dispensing and refrigeration startup records and equipment manuals.
Service isolation map and any selected gas-system safety/inspection documentation.
Cleaning products/procedures and access for lines, filters, drip trays and drains.
Defect closure, venue setup and any required operating approvals.
Make the layout work in daily use
Follow a drink through the station
Map ordering, payment, glass or cup selection, pouring or mixing, finishing and pickup. Add the return of used glasses and the removal of rubbish. Place popular items within the same working station rather than forcing staff to cross the whole bar for each sale.
Plan the delivery that happens during service
Draw how a full keg, a crate of bottles or a bag of ice gets from the delivery point into storage. Include the size and weight of those items, changes in level and door openings. A neat service counter can still be difficult to run if replenishment requires moving customers or dismantling fixtures.
Match the bar to the venue pattern
A permanent venue, seasonal garden bar and repeatedly transported event bar have different priorities. For a movable unit, identify the equipment secured for travel, removable signs and awnings, utility reconnection points and how the unit is locked at the end of an event.
Design decisions worth resolving early
Coordinate refrigeration and dispensing
Give the supplier the beverage range, keg arrangement and intended tap locations. Ask how refrigeration, product lines, drainage, gas equipment and cleaning access work together. Keep maintenance access available after the counters and wall finishes are installed.
Make washing and water provision explicit
Specify glassware, wash-up equipment, handwashing and hot-water needs. For a tank-fed bar, ask for fresh-water and wastewater volumes tied to the service plan and the refill and emptying routine. Do not assume a small sink package includes every connection the operation will need.
Price the venue around the shell
Delivery, unloading, site supports, power distribution, water and waste connections, weather protection and customer facilities may sit outside a fabricator’s fit-out. Assign each to a named party. For events, include opening setup, closing security and any repeated transport work in the comparison.
Tell the supplier what you need
Choose a starting layout, then send the supplier the facts that change the design. Ask for a separate description of the fitted unit, delivery and work at your property.
Beverage menu, draught taps, cocktail preparation and any food service.
Permanent, seasonal or event use, with the venue location and transport frequency.
Keg, bottle, ice, glass and refuse handling routes.
Refrigeration, dispensing, washing and water-heating equipment schedule.
Site supply or tank system, wastewater handling and available electrical connections.
List site work, licences, testing and opening tasks separately from fabrication, with someone responsible for each.
Project questions
Does a fitted container bar include permission to sell alcohol?
Buying the unit does not give permission to operate the bar. Check the licences, venue rules, food-service and public-access requirements for the operator and location. Agree who handles each step before setting an opening date based on the fabrication date.
Can a dry container be used as a beer cellar?
Only assess it as a specified conversion. The required storage conditions, insulation, refrigeration, drainage, equipment and maintenance access need design. A general storage shell is not automatically a temperature-controlled cellar, and the draught line from storage to tap also needs to be planned.
Can I move the bar between events?
If the bar will move between sites, plan for that from the start. Ask how equipment is secured, what must be removed for travel, the transport dimensions and lifting method, and how services reconnect. Check permission and operating conditions at every venue.
More details before you buy
Compare the shell with the fitted option
A service hatch and counter do not describe the whole bar. Ask for a dimensioned layout and an itemised scope before comparing prices.
Build scope
Get in writing
Shell to finish
Service openings, access doors, framing and finishes included, plus the work your team completes
Fitted bar
Exact dispensing, refrigeration, ice and washing equipment, with models and installation work identified
Plan for pouring and restocking
Place ordering, drink preparation and pickup around the intended staff positions. A draft-beer bar needs a different equipment layout from a bottled-drink counter or a cocktail service, so compare the proposed plan with your actual beverage menu.
Show how kegs, bottled drinks and ice reach their storage and serving positions. Check replacement and service access for the chosen equipment, and keep handwashing and glasswashing needs visible on the plan.
Choose how water, waste and power will be supplied
For a utility-connected bar, identify the potable-water supply, wastewater connection and electrical service at the venue. Match the proposed equipment's connection requirements to those available services.
For a tank-based proposal, document fresh-water and wastewater capacities, filling and emptying arrangements, and who services the tanks during use. Confirm the power source for refrigeration, dispensing, ice production and any water heating. Review the proposed arrangement for the particular venue and operation.
Include the work at the venue
Have the quote identify transport and final placement separately from support preparation, utility connections and customer access. Assign each task to the fabricator, installer or venue team, and state which drawings and inspections are included.
In your request, describe the drinks menu, serving layout, equipment and venue. Include available utilities and the restocking route. The supplier can then plan for serving customers and bringing in supplies.
Buying questions
Does buying a fitted bar include permission to serve alcohol?
Alcohol licensing applies to the operator and location. Confirm the applicable licensing and registration requirements with the responsible authorities separately from the unit purchase.
Prepare the Irish food-business requirements
Before operating a food business in Ireland, register with or obtain approval from the appropriate competent authority. Restaurants, cafés and many mobile food businesses are supervised by the HSE. Discuss the actual menu, food handling, water, waste, cleaning, ventilation and premises layout with the responsible authority before finalising the container fit-out. Registration is separate from planning and building-control requirements.
Plan this purchase for an Irish site
Describe the actual activity, occupancy, access, services and completion level. Allocate planning, fire safety, electrical work, drainage and any food-service or other use-specific requirements before comparing a factory unit with an installed project.
Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.
Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.