10ft
A small on-site inventory or a constrained placement area.
Door configuration can change pallet positions. Small size alone does not establish household-outlet compatibility.
View 10ft details →Describe what you need for your container purchase in Ireland. Compare written quotes that include the same work.
Compare 10ft, 20ft and 40ft refrigerated containers by usable space, temperature range, site power and purchase cost. Add your load and delivery Eircode to a quote request. For running costs, use measured energy consumption and your electricity tariff.

A small on-site inventory or a constrained placement area.
Door configuration can change pallet positions. Small size alone does not establish household-outlet compatibility.
View 10ft details →A moderate pallet inventory with regular receiving.
Reserve retrieval and loading access before treating every advertised position as usable storage.
View 20ft details →A larger batch held at temperature.
More floor length requires a loading and retrieval plan. Compare standard height with high cube; energy use does not follow a fixed 2× rule.
View 40ft details →Holding already chilled or frozen goods is a different duty from cooling warm arrivals or freezing a batch. State the incoming temperature, quantity and completion time when that work is required. An insulated shell without working refrigeration provides no active temperature control.
Request a model-specific loading plan for the actual pallet footprints and packaged dimensions. Euro pallets commonly measure 1,200 × 800 mm. Include overhang, loading access, air circulation and floor-load limits before agreeing capacity.
Include packaging overhang, loading equipment, door opening, evaporator space, air circulation and floor load limits. Confirm that the floor and the cooling system suit the load and operating routine.
Request a current, itemised euro quote for the exact refrigeration unit and insulated box and Irish delivery address. An equipment price alone is not the delivered project total.
| Quote item | Confirm in writing |
|---|---|
| Equipment | Size, condition, identified unit, included fittings and availability at the time of enquiry. |
| Transport | Collection location, delivery Eircode or site address, route, timing, ferry costs where relevant, and any access restrictions. |
| Unloading and placement | HIAB or separate crane arrangements, lifting reach, ground assessment, waiting time and responsibility for the final position. |
| VAT and additional work | Confirm whether each amount includes VAT. Consumer-facing totals should include applicable VAT and unavoidable charges. Identify electrical work, supports and other excluded work separately. |
| Validity and payment | Written quote expiry, deposit, balance date, cancellation terms and the party taking payment. |
Include the cooling-unit model, a dated operating test, required temperature, power supply, alarms and service history. Obtain an electrician’s assessment of the supply and connection.
Irish stock, supplier coverage and final prices must be confirmed by the seller.
Give the supplier the site voltage, phase, frequency and available capacity. Ireland normally uses 230 V single phase or 400 V three phase at 50 Hz; a marine reefer may need a specific three-phase supply, connector or transformer. A household socket does not establish compatibility.
Ask a qualified electrical contractor to assess the exact machine nameplate, protection, cable route and connection. State the required product temperature in °C and ask for a dated operating test, not just the controller setting.
Obtain model-specific consumption information and, where available, measured kWh for a comparable temperature, load, door routine and ambient conditions. Compressor input at one test point is not a daily electricity bill.
Illustrative calculation only: 20 kWh × €0.30/kWh = €6.00. These editable assumptions are not an Irish tariff or a performance claim. Use your own electricity contract and measured consumption; include any standing or capacity charges separately.
These marine manufacturer examples describe separate models. Dimensions are nominal; use the actual pallet footprints, packaged loads and each model’s loading instructions to establish capacity.
| Marine product example | Inside L × W × H, metres | Inside L × W × H, approximate feet (reference) | Door W × H, metres |
|---|---|---|---|
| Marine 20ft example | 5.321 × 2.235 × 2.248 m | 17.46 × 7.33 × 7.38 ft | 2.235 × 2.248 m |
| Marine 40ft standard example | 11.602 × 2.276 × 2.226 m | 38.06 × 7.47 × 7.30 ft | 2.276 × 2.299 m |
| Marine 40ft high cube example | 11.602 × 2.276 × 2.531 m | 38.06 × 7.47 × 8.30 ft | 2.276 × 2.603 m |
The high-cube example adds interior height, while its floor length and width match this standard-height example. Use the proposed unit floor, doorway and load line for a packaged-load plan; dry-container dimensions are not a reefer specification.
A non-operating reefer or NOR shell is not a working refrigerated purchase. For a used working unit, match condition photos, the machinery identity and the dated test report to the offered container. A PTI can include cooling and heating checks; review the procedure, results, skipped checks and repairs. A display photo shows one reading, rather than the temperature history or the performance of your load.
Have the quote itemise the shell and refrigeration, testing or repairs, delivery and placement, electrical equipment and setup, and taxes. Separate shell warranty from refrigeration warranty. Give the delivery operator the Eircode, approach and placement photos, unloading access and door orientation; retain access to the machinery for service. Moving an empty reefer is a different arrangement from carrying cold goods under power.
Before taking over the installed container, agree on the operating conditions, records and named contacts below. Confirm which recording and notification functions are included in the delivered configuration.
| Handover item | Evidence to keep | Person to name |
|---|---|---|
| Unit identity and handover file | Container and refrigeration identifiers; document list and unresolved items. | Person handing over the equipment; person accepting the file. |
| Operating conditions and site checks | Agreed duty, load, ambient and door-use assumptions; completed check record and outstanding conditions. | Person completing the checks; person accepting the operating conditions. |
| Sensors and stored history | Recorded sensor or channel and its location; logging settings, retention period, and whether and how records can be exported. | Person checking readings and keeping the records. |
| Remote notification, if supplied | Installed alert capability, connectivity and power-loss behaviour; named recipient and confirmation that the agreed notification reaches them. | Person verifying notification delivery; alert recipient. |
| Response to an alarm or failure | Named response owner, contact route and agreed action; note any service arrangements still unresolved. | Operating contact; person responsible for intervention. |
| Loss of refrigeration or site power | Agreed contingency for the stored goods, including any alternative storage or power arrangement; record unresolved arrangements. | Person authorised to activate the contingency. |
A displayed reading or stored history does not establish that an alert has reached someone who will act on it. A recorder battery does not establish refrigeration backup power.
Choose a format and chilled or frozen holding duty below to keep both in the editable request notes.
Add your load, required temperature, site power and delivery details. Review the format and intended-use selections before sharing the draft. The request builder prepares a draft you can edit, copy or download. Review and submit the request online with your consent. You can also keep a copy.
Specify the required temperature in °C, Euro-pallet or packaged load, operating routine, and site voltage, phase and frequency. Ask for the exact cooling-unit model, service record and a dated operating test.
Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.
Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.