🇮🇪 Republic of Ireland · €United States site
Toilet and shower configurations

Shipping Container Toilets & Showers for Sale

When comparing a shipping container toilet for sale, start with the floor plan and the way it will operate on your site. Choose toilet-only or combined shower facilities, then compare fixtures, water and wastewater arrangements, and the work included in each quote.

Prepare a quote request →
Conceptual cutaway illustration of toilet and shower compartments in a container.
Illustrative image. Conceptual cutaway illustration.
Layout
Toilet-only, individual rooms or toilet/shower combination
Utilities
Site connections or a specified tank arrangement
Capacity
Match fixtures and hot water to expected use
Quote scope
Unit, placement, connections and ongoing service
MAKE ROOM FOR YOUR PROJECT

Plan a container toilet and shower block around real daily use

Plan around the busiest period: a crew arriving before a shift, guests returning from the beach or visitors using facilities during an interval. The layout must support privacy, cleaning, replenishment and servicing as well as fit the fixtures.

Compare three starting arrangements, then request a plan for your users and property. Individual external entrances and a shared internal lobby need different circulation allowances. Sewer connections, holding tanks and on-site treatment also create different installation and operating scopes.

How to use these concept plans

These are concept zoning plans. The 5.5 × 2.15 m and 11.5 × 2.15 m rectangles are indicative internal planning envelopes, not guaranteed finished dimensions. Room sizes, fixture counts, access, privacy screens, door swings and any accessible layout must be resolved by the project designer. The diagrams do not establish accessibility or consent compliance.

Explore three ways to arrange the space

Concept layouts for comparing options. Develop the selected idea into a dimensioned design with your fabricator and project designer.

20ft: three private toilet rooms

Separately entered rooms for a workplace or visitor-facility brief, each with handwashing. Reserve a cleaning and service zone. Show the external approach and queueing space so open doors do not obstruct the path.

20ft toilet-only concept
20ft: three private toilet rooms — Concept layouts for comparing options. Develop the selected idea into a dimensioned design with your fabricator and project designer.
Swipe across the plan to explore it on a small screen.
Each WC room has its own external entrance; the zones are not linked in a walk-through sequence. Any required accessible facility needs its own reviewed layout and approach.Open / download this plan
  • 01 · WC + basin 1
  • 02 · WC + basin 2
  • 03 · WC + basin 3
  • 04 · Service / cleaning

Equipment and connections to resolve

  • Potable-water connection
  • Specified sewer or wastewater arrangement
  • Lighting and room ventilation

Ask your quote to cover

  • Three private rooms with basins
  • External-entry arrangement
  • Cleaning cupboard and service access

Three rooms are illustrated; this is not a fixture-count recommendation or an accessible-toilet layout.

20ft: two shower and changing suites

Two separately entered shower rooms, each with a screened wet bay and a changing bench on the entrance side. Keep hot-water equipment in the end service compartment with its own maintenance access.

20ft wash-and-change concept
20ft: two shower and changing suites — Concept layouts for comparing options. Develop the selected idea into a dimensioned design with your fabricator and project designer.
Swipe across the plan to explore it on a small screen.
Enter each suite on the changing side. The dashed screen/curtain marks conceptual splash separation; the end service compartment is accessed from outside. Confirm actual fixture dimensions, screen details and door clearances on the project drawing.Open / download this plan
  • 01 · Shower + changing 1
  • 02 · Shower + changing 2
  • 03 · Hot water / service

Equipment and connections to resolve

  • Potable cold water
  • Sized hot-water system and energy supply
  • Foul-water connection
  • Wet-area extraction

Ask your quote to cover

  • Two independently entered shower suites
  • Dry changing provision
  • Expected peak shower pattern

Two suites are shown. Hot-water recovery, ventilation and wastewater capacity must match the expected shower pattern.

40ft: combined crew amenity block

Separate toilet use, showering and operational space for a worksite or recreation venue. Review the finished width, private entrances and route to every room. A larger shell does not establish fixture capacity or accessibility.

40ft mixed-facility concept
40ft: combined crew amenity block — Concept layouts for comparing options. Develop the selected idea into a dimensioned design with your fabricator and project designer.
Swipe across the plan to explore it on a small screen.
Each room is entered from outside; shower screens/curtains separate spray from changing benches. A shared internal corridor would reduce room widths and require a different layout. Confirm actual fixtures, screens and door clearances before fabrication.Open / download this plan
  • 01 · WC room 1
  • 02 · WC room 2
  • 03 · Shower / change 1
  • 04 · Shower / change 2
  • 05 · Handwash / transition
  • 06 · Plant / cleaning

Equipment and connections to resolve

  • Water supply and hot-water recovery
  • Wastewater collection or discharge design
  • Electrical distribution
  • Room-by-room ventilation

Ask your quote to cover

  • Two toilet rooms and two shower suites
  • Actual daily and peak users
  • Separate plant and cleaning provision

The illustrated mix is a starting brief. Required fixture numbers and accessibility depend on the actual use and users.

FROM SHELL TO WORKING SPACE

Build a container toilet and shower block in the right order

This sequence takes a measured room layout through first-fix services, a complete wet-area system, fixture installation and witnessed operating checks. You can survey, count materials and prepare finishes; structural alterations, utility work and specialist testing need the appropriate project team.

Before ordering materials or cutting steel

  • Inspect shell condition, floor history and any unknown coatings or contamination before abrasive work.
  • Check water, wastewater, electricity and the entrance route. Agree whether wastewater goes to a sewer or needs tank servicing.
  • Choose an actual wet-area system and fixture schedule with the designer; resolve required access, privacy and local project review.

See the build sequence

From shell to working wash block — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Construction order, not a plumbing or reinforcement design.

Open / download the construction roadmap
Materials and how to estimate quantities

Quantities follow the chosen dimensions, openings and equipment. Measure the final design before buying; this is a selection guide, not a fixed shopping basket.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Specified internal framing and fixture backing

Supports partitions, basins and accessories.

Take lengths from the partition drawing; count backing at every wall-mounted fixture.Use the designed fastening and corrosion details; lining alone is not a structural fixing.
Mineral-wool or specified PIR insulation with designed air/vapour-control components

Controls heat flow and condensation risk at the steel enclosure.

Measure wall/roof areas, opening reveals and all service penetrations from the enclosure detail.Choose the layer positions and protection for the climate and wet-room use; this is separate from shower waterproofing.
Wet-area boards or proprietary waterproof panels

Forms the approved wall substrate.

Net wall area = perimeter × lined height minus openings; divide by sheet coverage.Choose a panel approved for the selected membrane, fixings and finish.
Matched shower tray, drain and waterproofing system

Connects floor, corners and waste outlet into one water barrier.

Count trays and drains; measure floor/wall area, junction lengths and each penetration.Select membrane, tapes, collars, adhesive and drain interfaces as a documented system.
Non-slip specified floor finish and joint sealants

Provides a maintainable final wet surface.

Use the floor plan for coverage and all movement-joint lengths.Confirm wet-use suitability and compatibility with substrate and cleaning products.
WCs, basins, taps and shower fittings

Defines the real room fit-out.

Count each item from the fixture schedule, including traps and installation kits.Use actual dimensional drawings before finalising partitions.
Potable-water pipework and hot-water package

Supplies the selected fixtures.

Measure routes on the service drawing; schedule fittings, supports and isolation points.Have the plumbing team specify pipe, insulation, heater and protective controls.
Waste pipes, traps and connection fittings

Carries foul water to the agreed destination.

Count branches and traps; measure the designed route and service-access points.The plumbing design determines sizes, gradients and venting, not this guide.
Extract ventilation, grilles and ductwork

Removes wet-room moisture and odours.

Count rooms and measure each actual duct route.Select duty and discharge positions for the finished rooms.
Corrosion system, seals and cleanable trims

Protects fabricated edges and finishes junctions.

Measure repaired steel area, opening perimeters and trim lengths.Use coating and sealant systems suited to the steel and adjacent materials.
Tools and equipment
  • Tape, laser measure and square

    Record shell, fixture and door dimensions.

  • Laser or spirit level

    Check supports and marked finished-floor levels.

  • Camera and numbered marker

    Record hidden services and inspection hold points.

  • Board-cutting tools and dust control

    Prepare the specified lining according to its instructions.

  • System-specified trowel, roller and seam tools

    Install the chosen waterproofing with its required coverage.

  • Sealant gun and finishing tools

    Complete specified flexible junctions.

  • Plumbing test instruments and electrical testers

    Used by the responsible trades to test and record system startup.

Work through the build in this order

  1. 01 Measure the rooms and calculate demand

    Fixture geometry and peak use drive the plan.

    • Mark finished wall faces and door swings on a measured plan, including lining thickness.
    • Record each selected shower’s flow, expected duration, how many run together and the gap between groups. Use these inputs for hot-water recovery and any water or wastewater storage; include the other fixtures in the daily demand estimate.

    Check before the next stage: The fixture schedule, room clearances and service destination are recorded.

  2. 02 Inspect and release the shell for work

    Repairs must be visible before they are covered.

    • Photograph roof, corner posts, floor, seals and previous repairs; mark leakage and corrosion.
    • Have unknown floor treatments, cargo residue or coatings assessed before stripping or hot work.

    Check before the next stage: The team has a repair list and a safe preparation method.

    Work to coordinate with the relevant trade: Container repair and hazardous-material work require suitable specialists.

  3. 03 Complete designed supports and openings

    Door and pipe openings affect the shell and weatherproofing.

    • Transfer only the approved opening and support locations to the shell.
    • The fabricator completes the specified temporary support, cutting, framing and edge treatment before interior layers start.

    Check before the next stage: Opening dimensions, attachment records and repaired coatings are checked.

    Work to coordinate with the relevant trade: The engineer/fabricator defines reinforcement and the cutting sequence.

  4. 04 Set partitions and concealed backing

    Fixtures need sound support behind the boards.

    • Mark finished partition faces and fixture centres, then dry-position the tray and fixture templates to check doors and usable space.
    • Fit the specified framing, fixture backing and access-panel surrounds; check the floor build-up against thresholds.

    Check before the next stage: Every fixture support and service hatch is photographed before boarding.

  5. 05 Install and test first-fix services

    Finding a joint after lining is avoidable rework.

    • Have water, wastes, vent ducts and electrical routes installed to the coordinated drawings.
    • Record pipe positions and have the responsible trades test their work before concealed areas close.

    Check before the next stage: The first-fix inspection and test records release the walls for closure.

    Work to coordinate with the relevant trade: Plumbing and electrical connections/testing belong to the appropriately qualified trades.

  6. 06 Insulate the enclosure and complete its control layers

    Shower waterproofing does not prevent every condensation risk at cold steel.

    • Measure framing bays and fit the approved insulation continuously at walls/roof and the specified floor/door details, without closing wet construction.
    • Complete the designed air/vapour-control junctions at corners, opening reveals and service entries; inspect and photograph dry, continuous layers before fitting wet-area boards.

    Check before the next stage: The enclosure layer check is accepted before substrate boards conceal it.

    Work to coordinate with the relevant trade: The enclosure designer chooses materials and layer positions for the actual climate and internal humidity.

  7. 07 Build one continuous wet-area system

    The drain and corners matter as much as the wall surface.

    • Dry-fit the tray and drain; check supported surfaces, outlet position and the manufacturer’s substrate requirements.
    • Cut and bond the selected membrane/panels, work out voids with the stated tool, and complete corners, seams and pipe collars by the system detail.
    • Observe that system’s curing period and perform its specified water test before concealing the waterproofing with finishes.

    Check before the next stage: Junctions and the water test are accepted before tiling or fitting finishes.

    Work to coordinate with the relevant trade: Use the selected product instructions and required inspection route; do not mix unverified systems.

  8. 08 Fit finishes, fixtures and access panels

    Final fittings must preserve the waterproof layer.

    • Install the specified finish and flexible joints, then fit fixtures at the prepared supports. Fix the selected shower screen or curtain track to its planned backing and keep the changing bench outside the spray zone.
    • Seal penetrations using the system detail; retain access to traps, valves, heater and ventilation equipment.

    Check before the next stage: Cleaning access, door operation and fixture fit match the finished plan.

  9. 09 Commission water, drainage, heat and ventilation

    A fitted room is not yet a tested facility.

    • Run the agreed simultaneous-use test with the plumbing and electrical teams; inspect accessible joints and drainage.
    • Record hot-water operation, extract operation, control settings and any tank alarms without inventing a universal acceptance temperature.

    Check before the next stage: Test results, applicable completion records and outstanding defects are written down.

    Work to coordinate with the relevant trade: The responsible trades set and verify system-specific safe operating limits.

  10. 10 Set up the cleaning and servicing routine

    The block needs an operating plan after delivery.

    • Label isolation and service points and file the as-built drawings and equipment manuals.
    • Walk through cleaning, consumables, tank access and shutdown with the operator; assign recurring service tasks.

    Check before the next stage: The operator can locate service points and demonstrate the agreed routine.

Mistakes that create rework

Buying fixtures before checking finished width

Use the lined room and real fixture drawings; the unmodified shell dimensions are not the usable room.

Tiling over an untested waterproof assembly

The visible tile surface does not prove the tray, corners or drain junction are watertight.

Hiding every connection

Leave the designed hatches accessible after shelving, cleaning storage and external works are added.

Checks before putting the space into use

  • Measured as-built room and service drawing.
  • First-fix, waterproofing and final service-test records.
  • Fixture, heater and ventilation manuals with applicable completion documentation.
  • Water and wastewater servicing responsibilities and access route.
  • Cleaning, defect and planned-maintenance schedule.

Make the layout work in daily use

Describe the operating day

Record daily users, peak demand, public or staff use, changing needs and identified access requirements. Use that pattern to develop the fixture and hot-water schedule.

Choose how the services will work

Mark water, power and foul-water connection positions. For tanks, identify freshwater and wastewater storage separately, service-truck access and who fills or empties them.

Review the complete installed layout

Review entrance levels, privacy, doors and plumbing space. Allocate supports, access works, connections and the applicable project review before accepting a finished-unit price.

Design decisions worth resolving early

Specify the cleaning routine with the finish

Specify cleanable finishes, floor junctions, drainage and serviceable plumbing access. Locate consumables and cleaning equipment without obstructing fixtures. Ask how wet-area details keep water out of concealed construction.

Size hot water around the peak

State expected shower duration, peak clustering and available energy supply. Request the actual heater, storage and recovery arrangement, plus access for maintenance and replacement.

Tell the supplier what you need

Choose a starting layout, then send the supplier the facts that change the design. Ask for a separate description of the fitted unit, delivery and work at your property.

Discuss my project →
  • Use, daily users and peak demand; any access or assisted-use requirements.
  • Room and fixture schedule, external entrances or shared lobby, and finished internal dimensions.
  • Water, hot water, ventilation and electrical equipment supplied, with connection points.
  • Agree sewer connection, holding-tank servicing or a separately designed on-site treatment system.
  • Wet-area finishes, cleaning storage, winter shutdown and maintenance information.
  • Delivery, unloading, supports, access works, site connections, testing and handover responsibilities.

Project questions

Can a toilet and shower block operate without a sewer connection?

A holding tank or on-site treatment system needs a property-specific arrangement. Define capacity, fill and pump-out access, operating responsibilities and any discharge approvals. A tank-equipped unit cannot operate indefinitely without service.

Do I need a 40ft block for a small team?

Decide which rooms you need and the busiest expected use first. Toilets alone need a different layout from showers, changing rooms and equipment. Plan fixtures and services before choosing the shell length.

Is an accessible toilet included in these concepts?

These diagrams do not claim an accessible layout. Request a specifically designed room and review its installed approach, entrance and fixture clearances. This can change the partitions or choice of module.

What should be checked at handover?

Agree checks for water, hot water, drainage, ventilation, electrical work and tank controls where supplied. Collect applicable completion records, equipment instructions and the cleaning and servicing schedule.

More details before you buy

Choose the rooms around the people using them

A floor plan makes the comparison more useful than a container length alone. Show the toilets, sinks, showers, doors and changing areas together so you can see how people enter, use the rooms and leave. The finished layout should account for plumbing space and the clearances around each fixture.

ConfigurationUse to considerCompare on the plan
Toilet-onlyToilets and handwashing at a workplace or visitor siteFixture mix, individual stalls, entrances and peak demand
Individual roomsUsers who need a private roomDoor swings, usable space and the route to each room
Toilets and showersSites where users also wash and changeShower compartments, changing space, wet areas and hot-water demand

Match the water and wastewater plan to the site

For a connected unit, compare the water inlet, wastewater outlet and electrical requirements with the services available where the container will stand. Ask which connections are fitted in the unit and which pipes, fittings or equipment must be supplied on site.

For tank operation, identify freshwater supply and wastewater storage separately. The quote should describe the tanks provided, how they are filled or emptied, and the expected use behind any servicing estimate. Allow access for that work and establish who will provide it.

Showers add a hot-water requirement. Confirm the heater, available power or other energy supply and capacity for the expected shower pattern. For a septic or other on-site wastewater arrangement, have the relevant local authority and a qualified wastewater professional assess the actual use, loads, site and applicable approvals.

Review accessibility on the installed plan

Describe whether the facility will serve a private home, employees, guests or the public. That use helps the project designer establish the applicable accessibility and building requirements.

Where accessible facilities are required, review the approach, doors, turning space, fixtures, controls and showers with the project designer against the applicable Irish requirements, including Part M where relevant. A product label does not establish compliance of the installed layout. Have the responsible designer or employer confirm fixture provision and workplace welfare requirements for the actual use and number of users.

Compare the purchase, site work and service costs

Match quotes to the same fixture schedule and finish level. A shell to finish locally and a fitted toilet are different purchases; each quote should name the fixtures, plumbing, lighting, ventilation, hot-water equipment and finishes included.

Identify who prepares the supports, unloads and positions the unit, connects the services and completes the applicable inspections. Keep those site costs visible beside the unit price. For a tank arrangement, also price water delivery, pump-out and cleaning under an agreed service scope.

Before accepting the completed project, agree how the installed fixtures, water supply, wastewater connection, hot water and ventilation will be checked. Record who completes those checks and hands over the operating and maintenance information.

Prepare a toilet and shower quote request

Include the site Eircode, intended use, expected daily and peak users, preferred rooms and fixtures, and whether water, sewer and power are available. Describe the delivery approach and any limits on service-truck access. Use those details to compare the supplied unit, site work and operating service on the same basis.

Buying questions

Does buying the unit include cleaning and tank service?

Confirm that in the written scope. Equipment supply, plumbing connections, cleaning, water replenishment and wastewater pump-out can be separate responsibilities and costs.

Plan this purchase for an Irish site

Ask for recent photos and a condition report for the actual unit. Product names such as 10ft, 20ft and 40ft are useful, but use actual metric measurements for access, foundations and usable space.

Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.

Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.