SINGLE TRUSS / Grey PVC

7.925 × 6.096 m (26 × 20 ft) Container Shelter

This is a roof-kit example. Before ordering, confirm the selected product, site design and what the Irish supplier and installer will provide.

More nominal width with a short roof length: single truss galvanised steel and a grey PVC cover.

€4,400–8,000

Indicative price. Prices in euros (€), including 23% VAT. Prices cover the conversion or kit described. Supporting containers, additional fit-out, site work, transport and installation are quoted separately.

  • Frame material and finish to confirm
  • Cover material and colour to confirm
  • Supporting containers sold separately
MAKE ROOM FOR YOUR PROJECT

Use the extra width of a 26 × 20 ft shelter deliberately

The 26 × 20 ft nominal layout gives a wider starting roof plan while retaining a short depth. Use that width for something specific: equipment access beside a parked machine, separate storage and picking, or an open front work zone.

The illustrations keep movement visible so the wider roof does not simply collect more stored items. Compare equipment at its working size and ask the supplier to mark the actual support gap and entry profile for the selected roof.

How to use these concept plans

Concept layouts based on a 26 × 20 ft nominal roof label. Support spacing and finished clearances are model-specific, not the dimensions of the coloured zones.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

Equipment with a working side

Offset the equipment to leave a distinct side for inspection, loading or service access. List which panels and attachments open into that area. Keep the front approach free so the wider bay remains easy to enter and the work area can be used without moving unrelated stock.

26 × 20 ft nominal container-supported roof
Equipment with a working side — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
No servicing task or load is approved by this concept.Open / download this plan
  • 01 · Equipment
  • 02 · Service side

Site, equipment and services to resolve

  • Portable or fixed task lighting
  • Any servicing power needs

Ask your quote to cover

  • Equipment and opened-panel size
  • Working side required
  • Entry and exit method

The working side has no fixed clear width until the equipment and exact roof are selected.

Storage edge and a dedicated loading side

Place stock along one edge, keep a clear picking strip, and use the remaining width for incoming or outgoing loads. State whether a forklift, trolley or manual handling process is proposed. Check the handling route before selecting an end wall or door.

26 × 20 ft nominal container-supported roof
Storage edge and a dedicated loading side — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Keep the whole picking route connected to the front approach.Open / download this plan
  • 01 · Stock
  • 02 · Picking route
  • 03 · Load staging

Site, equipment and services to resolve

  • Picking light
  • Ground surface for handling equipment

Ask your quote to cover

  • Incoming load dimensions
  • Handling equipment
  • Weather sensitivity of stock

Storage and handling areas are illustrative; rack capacities and machine routes are separate inputs.

Protected rear zone with an open approach

Request a compatible rear end wall where additional weather screening is useful, while keeping the front approach open. Put the work or stored items toward the protected end and leave a clear front staging zone. Explain the required protection rather than assuming an end panel creates a sealed room.

26 × 20 ft nominal container-supported roof
Protected rear zone with an open approach — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Rear enclosure is an option request, not an included panel.Open / download this plan
  • 01 · Rear activity zone
  • 02 · Staging and access

Site, equipment and services to resolve

  • Lighting if needed
  • Runoff management at the open end

Ask your quote to cover

  • Rear end-wall request
  • Activity at the protected end
  • Required ventilation and weather protection

One end-wall request is illustrated; availability, ventilation and finished details require confirmation.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

Build a 26 × 20 ft shelter with a checked wider support gap

Use the extra nominal width for a defined side working area, then set the supports from the actual mounting references. Sort the short roof’s marked members, connect and brace each planned bay, and centre the matched cover before tensioning.

Before delivery and roof assembly

  • Check both support heights and actual rail positions for the short wide model.
  • Confirm rail-hand orientation, clamps and the selected mounting method.
  • Resolve wider-span lifting access and any protected rear-end request.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched single-truss frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    The wider short kit has its own arch segments and rail hardware.

    • Match the delivered model, drawing revision and part marks to the current packing list.
    • Separate left/right rail ends, connecting pieces, clamps, arch clips and cover tension parts.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    Extra nominal width changes the working gap but does not define it.

    • Set support lines from the actual 26 × 20 ft mounting layout and measure diagonals.
    • Check the side working area, front approach and support doors against the planned equipment layout.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Place and secure supports with the designed anchorage, preserving the measured reference gap.
    • Check height and level at the rail attachment positions, not only at the ground corners.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    The mounting references and component orientation must agree on both supports.

    • Lay out the identified rails or plates in the drawing order and check their orientation against the marked support references.
    • Complete only the accepted connection detail for this kit. Inspect the end and intermediate attachments, keep tensioning points accessible and restore the specified protection before raising frames.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Finish every purlin row and diagonal brace on the short roof run.
    • Inspect fastener orientation at fabric contact lines and fit protective caps or details required by the kit.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    The wider sheet must reach both sides evenly without being dragged across sharp hardware.

    • Lay out the actual cover and identify front/back, tension pockets and pulling points.
    • Pull evenly in the manufacturer’s working conditions, retaining control and checking end overhang.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Insert the matched tension tubes and loosely connect the prescribed edge and corner attachments.
    • Centre first, then adjust the specified lacing and ratchets progressively in the kit’s order.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    The extra width must remain usable after all attachments and optional panels are fitted.

    • Inspect mounting, braces, cover profile and any matched rear panel without assuming an advertised gap is a clear opening.
    • Walk the side working area and record care, tension checks and access to ratchets.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Decide what the added width solves

Mark the side access, loading zone or operator space that did not fit comfortably in the compact concept. Keeping that purpose explicit gives you a useful comparison with both narrower and larger alternatives.

Measure the approach as well as the bay

A short roof may fit the yard while a long load or trailer cannot line up with it. Draw turning and stopping space outside the outline before setting the supports.

Choose enclosure before finalising openings

State which end is open, which end needs screening and how the equipment enters. Request the finished door width and height with the selected frame, cover and container heights.

Compare kit and assembly together

Ask how the kit will be mounted, what supports it needs and who assembles it on site. Include the condition of existing containers and repairs needed before fitting the mounts.

Design decisions worth resolving early

Mark the selected mounting reference

Highlight whether each dimension is measured between support faces, rail positions or attachment centres. Record the chosen reference on the site set-out sheet and use it consistently on both supports. Do not choose a clamp or welded detail from a different kit.

Match height as well as width

Record both support heights and mounting levels, then check the finished opening and any proposed end wall on the same drawing. Include service panels or attachments that rise above the parked equipment outline.

Keep access to the supporting boxes

Stock or a workbench placed beside a container can block its doors or the route used to retrieve tools. Show which container openings are used each day and keep them connected to the site circulation.

Describe protection in practical terms

For example, explain which direction rain enters, which goods must stay dry and when the bay is occupied. The supplier can then discuss an appropriate enclosure and operating arrangement rather than guess from 'weatherproof'.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • Purpose of the extra width
  • Equipment, load and handling dimensions
  • Support heights, lengths and condition
  • Exact mounting and opening drawing
  • Open or protected end arrangement
  • Ground preparation and access
  • Separate prices for supply, freight, placement and assembly

Project questions

Does 26 ft mean a clear 26 ft gap?

The nominal roof label is not a verified clear opening. Ask for the gap between support faces, mounting references and inside frame profile on the actual model drawing.

Can I add a rear panel later?

Discuss it with the original supplier before ordering. Matching end-wall parts, connections and the complete support design need to be suitable for that configuration. An unsupported aftermarket panel should not be assumed compatible.

Will a wider roof make a better work area?

Only if the extra width supports the actual task. Draw the bench, workpiece, operator and equipment routes. Also brief the supplier about services, extraction and weather exposure associated with that work.

What should be included in an installed quote?

Request separate lines for the selected kit, mounts, supports, site preparation, engineering, freight, unloading, assembly and taxes. Include the enclosure request and any work required on existing supporting containers.

Plan your configuration

Choose what to include in the quote. Options are priced separately after model and site confirmation.

Specifications

Nominal roof width
7.925 m (26 ft)
Nominal roof length
6.096 m (20 ft)
Nominal roof plan
48.3 m² (520 sq ft)
Frame
Single truss
Frame material
Confirm the offered material and protective finish
Selected cover
Confirm the offered material, colour and product reference

What the base kit covers

ItemScopeDetails
Roof frameConfirmConfirm the offered frame type, material, protective finish and complete included-part schedule in the quote.
Roof coverConfirmConfirm the matching cover’s material, colour, product reference and included attachments in the quote.
Mounting hardwareConfirmExact feet, bracing, fasteners and anchors on the packing list.
Supporting containersSeparateExisting containers or separately supplied supports.
End walls & doorsSeparateModel fit, availability and finished opening to be quoted.
Freight & installationSeparateDelivery Eircode, unloading, site work, assembly and taxes.

Compare room across the bay

This kit adds nominal width over the 6.096 × 6.096 m (20 × 20 ft) option while retaining a 6.096 m (20 ft) nominal roof length. Use that comparison to test your yard layout.

Plan a working aisle

Draw the equipment at its full operating width, including open doors and attachments. Then check the clear space available alongside it on the final layout.

Measure away from the centre

Equipment height matters where it sits and travels. Ask for the inside roof profile and measure your load at the sides as well as at its highest point.

Keep depth in the comparison

If the layout needs a longer roof, compare the 10.058 × 12.192 m (33 × 40 ft) kit. A wider 6.096 m (20 ft) long plan cannot substitute for the extra nominal length of that configuration.

7.925 × 6.096 m (26 × 20 ft) nominal dimensions

7.925 m (26 ft) wide × 6.096 m (20 ft) long gives a 48.3 m² (520 sq ft) nominal roof plan. Confirm the usable container gap, entry opening and inside roof profile on the exact model drawing.

Nominal plan
48.3 m² (520 sq ft)
Width basis
Nominal roof label
Clear opening
Exact model drawing
Support spacing
Exact mounting layout

Delivery and assembly

Roof-kit freight and container delivery are separate. Use the exact shipment and site layout to plan both.

Packed kit

Request the actual selected kit’s packing list, package count, weights in kilograms, dimensions in metres and unloading instructions. A family-level or overseas listing is not the shipping specification for an Irish order.

Site and supports

Prepare the ground levels, drainage and access. Match the container arrangement, attachments and foundations to the selected roof.

Unloading and build

Agree who supplies lifting equipment and assembles the kit. Check truck access, the order of assembly and which delivery work is included.

Assembly, care and warranty

Ask for and keep the documents for the exact frame and cover you are buying.

Assembly and parts

Matching assembly manual, complete parts list and support/mounting drawing.

Cover care

Model-specific tensioning, inspection and weather procedures, plus the correct replacement-cover reference.

Written warranty

Coverage for the frame and cover, exclusions, start date and claims process. A material lifespan label does not define a warranty.

Compare other kits

Compare all shelter sizes

Compare the five illustrative roof sizes and frame configurations, then request the actual Irish supply and installation scope.

Questions

Does 7.925 m (26 ft) mean 7.925 m (26 ft) of clear space between containers?

7.925 m (26 ft) is the nominal roof-width label. A clear gap requires a drawing with the attachment locations, container faces and finished opening identified. Use that drawing to check your equipment and working aisle.

Can I change the cover or add end walls?

State the cover material, colour and enclosure you need in the request. Confirm compatible cover, end-wall and door parts for the actual offered model, with finished opening dimensions and any price change.

What do I need for an installed price?

Add your delivery Eircode, supporting containers, wall and opening requirements, access and assembly scope. The quote should separate kit supply, freight, unloading, supports, site work, installation and taxes.

Build your request around this kit

7.925 × 6.096 m (26 × 20 ft) · Single truss · Grey PVC. Add your site details and the options you selected.

Prepare my quote

Plan this purchase for an Irish site

Give the supplier your required clear span and height in metres. Confirm wind exposure, drainage, mounting, support-container condition, foundations and the selected enclosure as one complete installation.

Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.

Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.