Compare the complete site-office fit-out
Match the size, height, doors, windows, insulation, lining, flooring, electrical equipment and cooling in each proposal. Separate factory work from transport, offloading, foundations, local connections and approvals, and confirm VAT in the written total.
Identify what the quoted price buys
Do not add the price of an empty container to a package that already includes it. Check the same for doors, insulation, electrical work, heating and cooling included at the factory. An internal electrical package does not tell you the cost of bringing power to the site.
| Quote type | What to establish before using the total |
|---|---|
| Modifications only | Whether you supply the container; which repairs, cuts, framing, finishes and equipment are included; where the work occurs. |
| Container plus factory conversion | Shell size, height and condition; the finished factory specification; the point at which responsibility passes to you. |
| Rough-in or partial conversion | Exactly what is unfinished. Separate internal wiring or plumbing from fixtures, tests, final connections and any locally completed work. |
| Delivered and installed project | Transport, offloading, foundation, placement, utility connections and completion responsibilities. Identify every allowance and exclusion. |
Build the missing-cost list
For each item, record whether it is included, excluded or unclear. Name who does it and list the written price or allowance. Keep unpriced work visible instead of counting it as zero.
Decide the use, layout and local approval steps before ordering changes that cannot easily be undone. Cutting openings can affect the structure. Agree opening and reinforcement details with the designer or fabricator. Also settle access, foundations and utility routes before treating a factory price as a complete budget.
| Budget line | Scope question |
|---|---|
| Container and initial condition | Is the shell included? What inspection, repairs, cleaning or floor work does the quote assume? |
| Design, cuts and reinforcement | Are drawings, openings and structural work defined before fabrication? Who prices changes to the layout? |
| Doors, windows and weather detailing | Which units, installation details, seals, trim and exterior finishes are included? |
| Insulation and interior completion | Which walls, ceiling, floor and doors are covered? Are framing, protective lining and finished flooring included? |
| Electrical, plumbing and conditioning | What equipment and internal work are included, and where do site connections begin? |
| Transport, offloading and placement | Does the quote reach the final placement point, and who provides the offloading equipment? |
| Foundation and utilities | Who handles site design, ground work, foundation, drainage, trenches and service connections or upgrades? |
| Approvals, tax and changes | Which design reviews, permit fees, inspections and taxes are priced? How are scope changes authorised and charged? |
Keep a home budget separate
A residential conversion needs a separate South African quote. Describe the shell, structural work, openings, insulation, finishes, kitchen, bathrooms and systems, then price land, design, approvals, foundations, service connections, transport and offloading separately.
Do not treat a factory shell or module price as an occupancy-ready home budget. Ask the municipality and relevant residential-building authorities which approvals apply at the site, and identify the party responsible for every excluded or unresolved task.
A dwelling adds a different use and completion scope from a simple office. Keep its price separate from the office examples and use the container-home cost guide for the broader residential budget. Confirm that the intended dwelling can be approved at the actual site before committing to a module.
Resolve differences before choosing a total
- Send the same layout, shell condition and finish schedule to each provider. Identify alternatives as separate options.
- Reconcile different opening counts, insulation coverage, lining, equipment and connection boundaries before comparing prices.
- Ask for a dated written quote. Check how long it is valid, which site details it relies on and what it excludes.
- Keep the factory subtotal, transport and placement, site completion, and applicable fees visible as separate groups. Add only non-overlapping priced work.
- Ask who handles each unpriced item and what they need to price it. The budget is incomplete until that work is priced.
Prepare a clear conversion request
Prepare an editable request with the intended use, project postal code, size and height, shell condition and a layout showing doors, windows and equipment. State whether you already own the container. Include the required finish, insulation coverage, heating/cooling and utility needs.
- Describe delivery access and the final placement area, with site photos or a plan where available.
- Identify known foundation and utility arrangements and who will complete local work.
- Ask for separate lists of factory work, transport and placement, and work to finish on site. List anything still unknown.