SINGLE TRUSS / GREY PVC

12.192 × 12.192 m (40 × 40 ft) Container Shelter

A broad square roof plan with a single truss galvanised steel frame and grey PVC cover.

R120,000–216,000

Indicative price. Prices in ZAR, including 15% VAT. Prices cover the conversion or kit described. Supporting containers, additional fit-out, site work, transport and installation are quoted separately.

  • Frame material and finish to confirm
  • Cover material and colour to confirm
  • Supporting containers: quote separately
MAKE ROOM FOR YOUR PROJECT

Make the square 40 × 40 ft shelter layout work for your site

A square nominal roof plan can separate activity across the width as well as along the depth. Use that flexibility to preserve circulation, rather than deciding that the whole footprint can be filled with equipment. Show what happens at the busiest moment of the day.

These concepts illustrate side-by-side work, storage with a cross-route and a flexible staging bay. They all refer to the single-truss option on this page. A different frame sold under the same size label needs its own drawings and quote.

How to use these concept plans

Concept layouts for a 40 × 40 ft nominal single-truss roof. The diagrams show activity zones, not approved lane widths, clear heights or floor capacities.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

Two activity zones with a shared route

Give each activity a defined side and keep a shared movement route between them. Draw workpieces, equipment panels and operator positions at their largest size. If the two operations run at the same time, check that one does not send people or materials across the other's working area.

40 × 40 ft nominal container-supported roof
Two activity zones with a shared route — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
No partitions or equipment are implied by the coloured zones.Open / download this plan
  • 01 · Activity A
  • 02 · Shared route
  • 03 · Activity B

Site, equipment and services to resolve

  • Separate equipment service schedules
  • Task lighting for each activity

Ask your quote to cover

  • Both operating envelopes
  • Simultaneous use
  • Shared route and approach

The two zones are examples of separation, not a promise of two vehicle or machine bays.

Storage edges and a clear cross-route

Place storage at the sides and keep a route through the centre with a turning or transfer space near the entrance. This arrangement can help prevent a receiving load from blocking retrieval. Show how the handling machine reaches each stock position and leaves the bay.

40 × 40 ft nominal container-supported roof
Storage edges and a clear cross-route — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
The cross-route is schematic, with no forklift turning radius specified.Open / download this plan
  • 01 · Storage A
  • 02 · Central aisle
  • 03 · Storage B
  • 04 · Transfer space

Site, equipment and services to resolve

  • Stock and route lighting
  • Ground surface brief

Ask your quote to cover

  • Rack or stock dimensions
  • Handling machine and space to turn
  • Receiving sequence

Transfer space must be sized for the actual load and handling method.

Rear storage with an open staging floor

Concentrate longer-term storage at the rear and keep the front open for changing deliveries, assembly or equipment staging. Mark the largest temporary load on the plan and set a rule for keeping the access route open. State any rear end-wall request before the final roof design is quoted.

40 × 40 ft nominal container-supported roof
Rear storage with an open staging floor — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Rear end wall is a requested option, not an included element.Open / download this plan
  • 01 · Rear storage
  • 02 · Staging floor
  • 03 · Clear access

Site, equipment and services to resolve

  • Flexible task-light arrangement
  • Any temporary equipment services

Ask your quote to cover

  • Largest temporary load
  • Protected rear-end request
  • Daily route to stored items

Specify the staging area's ground surface and the work it must support.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

Build the 40 × 40 ft single-truss shelter as a checked frame system

Keep the selected single-truss frame, cover and mounting layout together from inventory to final inspection. Prepare the planned frame assemblies, establish the restrained first bay and complete its bracing before the cover is spread and tensioned.

Before delivery and roof assembly

  • Confirm the actual rail layout, roof profile and single-truss parts revision.
  • Resolve any parts-list/drawing discrepancy before selecting connection hardware.
  • Reserve the full frame-assembly and lifting area, not just the nominal square.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched single-truss frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    The same nominal footprint can hide different frames and connections.

    • Check model, frame type, cover reference and revision against the packing list.
    • Lay out fasteners by their actual part codes and obtain clarification if a procedure and parts list disagree.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    A square label does not identify the support faces or manufactured dimensions.

    • Mark actual mounting references and check full-bay diagonals rather than using the roof name as a spacing rule.
    • Show simultaneous work zones, support doors and the entry route outside the assembly area.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Place the approved supports on the designed foundations and complete their anchorage.
    • Check mounting-station levels and the long rail alignment on both sides.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    Both rail lines must accept the matching single-truss frame positions.

    • Install the identified rail segments, joint plates and selected clamp or designed welded attachment.
    • Verify each frame position and end attachment before lifting the wide arches.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Check every purlin row, brace and attachment across the complete square-plan frame.
    • Inspect end fittings, exposed bolt direction and all prescribed fabric-contact protection.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    The wide cover needs a clear pulling route and agreed handlers.

    • Spread and orient the correct single-truss cover before moving it onto the frame.
    • Follow the actual pulling method in suitable conditions, checking both sides and end overhangs before tension.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Fit the actual pocket tubes, end lacing and corner/side attachments without substituting another model’s layout.
    • Apply the prescribed progressive tensioning sequence and check the final cover profile.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    The completed frame and the intended work layout need separate checks.

    • Record supports, mount connections, braces, fabric contact and tension checks against the actual model.
    • Walk the planned working and retrieval routes, then hand over inspection and cover-care instructions.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Test the busiest simultaneous layout

Place all equipment that will be present at once, then draw people and material routes around it. Include a delivery arriving while the usual stored items remain in position.

Specify the exact frame

Specify the single-truss model from this page when comparing offers. Include the selected cover, support arrangement and enclosure so a similarly named alternative is not mistaken for the same system.

Compare width at the exact roof profile

Mark the height and width of each load where it sits, not only at the centre. Request the finished end opening and any lower shoulder restrictions on the supplied drawing.

Coordinate the ground and installation

Give the contractor the proposed traffic, equipment and storage loads for the site surface design. Separately agree foundations, support placement, kit staging and the installer's lifting sequence.

Design decisions worth resolving early

Keep the selected frame version explicit

Record the single-truss model and drawing revision with the cover and mounting details. Check these against the delivered labels before grouping the parts; the same nominal square plan does not make another frame or cover interchangeable.

Do not infer a rating from the word truss

Ask for documents covering the complete model and installation at your site. A label or photo cannot tell you the wind, snow, anchor or foundation requirements.

Reserve container access

Decide which support box stores equipment and which doors are opened during work. Keep their approach, opened-door area and daily retrieval route visible beside the roof activities.

Enclosure belongs in the first comparison

Decide whether the bay will stay open, be partly screened or be enclosed. State the doors and ventilation needed before comparing the complete installed offers.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • Single-truss model and selected cover
  • Busy-day equipment and load layout
  • Required finished opening at each end
  • Support-container dimensions and condition
  • Storage and handling method
  • Ground surface, drainage and foundation work
  • Openings, services, delivery and assembly responsibilities

Project questions

Can I fit two vehicles side by side?

Use their actual operating widths, door swings and service access, then compare the complete arrangement with the clear bay and roof profile. The two-zone concept does not state a vehicle capacity.

Is every 40 × 40 ft shelter the same?

No. Manufacturer ranges can use the same nominal size for different frames and mounts. Compare the exact model, cover, mounting drawings and installed scope rather than the size label alone.

Does the square plan remove the need for turning space?

No. Handling and vehicle movements extend beyond a parked footprint. Draw the largest load and its approach, turning and exit path both inside and outside the roof outline.

When should I look at the 60 × 40 ft peak option?

Compare it when a measured working layout needs more nominal width. That option changes the frame as well as the label, so compare its profile, supports, assembly and complete site scope alongside the extra area.

Plan your configuration

Choose what to include in the quote. Options are priced separately after model and site confirmation.

Specifications

Nominal roof width
12.192 m (40 ft)
Nominal roof length
12.192 m (40 ft)
Nominal roof plan
148.6 m² (1,600 sq ft)
Frame
Single truss
Frame material
Confirm the offered material and protective finish
Selected cover
Confirm the offered material, colour and product reference

What the base kit covers

ItemScopeDetails
Roof frameConfirmConfirm the offered frame type, material, protective finish and complete included-part schedule in the quote.
Roof coverConfirmConfirm the matching cover’s material, colour, product reference and included attachments in the quote.
Mounting hardwareConfirmExact feet, bracing, fasteners and anchors on the packing list.
Supporting containersSeparateExisting containers or separately supplied supports.
End walls & doorsSeparateModel fit, availability and finished opening to be quoted.
Freight & installationSeparateDelivery postal code, offloading, site work, assembly and taxes.

Compare a broad square layout

Use the square nominal plan to sketch equipment positions and access lanes. Confirm the usable opening and interior roof profile for this single truss model.

Plot equipment side by side

Place each vehicle or machine at its full operating width. Include the shared aisle, door swings and room to access the supporting containers.

Name the frame in every offer

A 12.192 × 12.192 m (40 × 40 ft) size label can describe more than one roof system. Request this single truss configuration with the grey PVC cover when comparing prices.

Compare the next width carefully

The 18.288 × 12.192 m (60 × 40 ft) option also has a 12.192 m (40 ft) nominal length, but it changes to a double truss peak frame. Compare the complete support and assembly arrangements.

12.192 × 12.192 m (40 × 40 ft) nominal dimensions

12.192 m (40 ft) wide × 12.192 m (40 ft) long gives a 148.6 m² (1,600 sq ft) nominal roof plan. Confirm the usable container gap, entry opening and inside roof profile on the exact model drawing.

Nominal plan
148.6 m² (1,600 sq ft)
Width basis
Nominal roof label
Clear opening
Exact model drawing
Support spacing
Exact mounting layout

Delivery and assembly

Roof-kit freight and container delivery are separate. Use the exact shipment and site layout to plan both.

Packed kit

Get the selected kit’s packing list with package count, individual dimensions and weights. Agree handling and unloading equipment for that shipment before delivery.

Site and supports

Have a competent local designer assess wind exposure, ground, corrosion conditions, anchors, supporting-container condition and foundations for the actual South African address. Confirm the municipal requirements and match the kit’s drawings to that site design.

Offloading and build

Agree who supplies lifting equipment and assembles the kit. Check truck access, the order of assembly and which delivery work is included.

Assembly, care and warranty

Ask for and keep the documents for the exact frame and cover you are buying.

Assembly and parts

Matching assembly manual, complete parts list and support/mounting drawing.

Cover care

Model-specific tensioning, inspection and weather procedures, plus the correct replacement-cover reference.

Written warranty

Coverage for the frame and cover, exclusions, start date and claims process. A material lifespan label does not define a warranty.

Compare other kits

Compare all shelter sizes

Compare five reference roof sizes and frame configurations, then request the locally supplied kit and installed scope.

Questions

What changes from 10.058 × 12.192 m (33 × 40 ft) to 12.192 × 12.192 m (40 × 40 ft)?

The two labels keep the same nominal depth and change the width. Draw the actual side-by-side activities and their shared movement route on both plans, then compare clearances and the exact single-truss model, cover and mounting scope offered for each.

Can I change the cover or add end walls?

State the cover material, colour and enclosure you need in the request. Confirm compatible cover, end-wall and door parts for the actual offered model, with finished opening dimensions and any price change.

What do I need for an installed price?

Add your delivery postal code, supporting containers, wall and opening requirements, access and assembly scope. The quote should separate kit supply, freight, offloading, supports, site work, installation and taxes.

Build your request around this kit

12.192 × 12.192 m (40 × 40 ft) · Single truss · Grey PVC. Add your site details and the options you selected.

Prepare my quote