How to find the cheapest suitable container delivered
Start by defining what the container must do: the items it must hold, the condition you will accept, how you will use the doors and where it will be placed. A low price is useful only when the offered unit and delivery plan meet those requirements.
Give sellers the same requirements and site information. Ask for itemised, dated offers with current condition evidence or clear allocation and inspection terms. Compare the complete amounts among suitable offers, then resolve any unpriced required work before choosing.
| Possible saving | Check before changing the request |
|---|---|
| Choose a smaller feasible format | Confirm the usable layout and access you need. Compare complete delivered offers; a smaller unit does not guarantee a lower delivered cost. |
| Choose a used unit suited to the job | Check its actual condition and any required repairs. Compare the resulting budget with an acceptable one-trip or unused alternative. |
| Change delivery timing | Ask whether a different window changes the written price. Record the revised terms instead of assuming a discount. |
| Collect from the depot | Price loading, road transport and unloading at your site. Confirm release arrangements and who is responsible at each step. |
| Remove optional extras | Keep work needed for your intended use in the budget. Price optional paint, shelving or modifications separately. |
Look for the lowest complete cost among the suitable offers you have checked. A few quotes do not prove which supplier is cheapest across the whole market.
Ask for these line items
If one seller includes unloading and another excludes it, their headline prices are not yet comparable. Ask for a revised total using the same scope. Keep separately booked work in your overall budget.
| Line item | What belongs in the written offer |
|---|---|
| Container | Size, condition, quantity, unit selection and price per unit. |
| Transport | The charge to deliver to your final address, including any separately quoted transport fees. |
| Unloading and placement | Whether taking the container off the lorry and placing it at the agreed spot are included or priced separately. |
| VAT and fees | Applicable amounts or how they will be calculated; whether the displayed total includes them. |
| Optional work | Lockbox, repainting, shelving, repairs or modifications priced separately. |
| Conditional charges | Waiting time, difficult access, failed delivery, rescheduling or additional handling. |
Separate the quoted total from your project budget
Add the confirmed purchase and delivery total to required work you book separately. Count each charge once: if unloading is already included in the delivered total, do not add it again. Keep estimates and unresolved amounts labelled until confirmed, and record a conditional fee with the event that would trigger it.
| Budget category | How to record it |
|---|---|
| Confirmed quoted amounts | Container, transport, unloading and other required charges included in the written offer. |
| Work you arrange separately | Site preparation, supports, permissions or additional equipment; obtain a separate estimate where needed. |
| Unresolved amounts | VAT or required work not yet priced. Mark them unknown and resolve them before treating the budget as complete. |
| Conditional charges | Waiting, access failure or rescheduling; record the trigger and amount or rate separately. |
Make the factors behind each quote explicit
Ask the seller how size, condition, quantity and unit selection affect the offer. If you compare used and one-trip units, ask for the actual condition terms and current photos of the unit or the selection process being offered.
Give each seller the same address and access information. Confirm what the delivery and unloading amount covers, then keep site preparation or other separately arranged work in the wider project budget.
Compare offers without hiding missing amounts
For purchases from different sellers, the dispatch locations can differ. Record each actual origin and its delivery charge; keep the final site and service requirements consistent. For quotations to move the same container you already own, use the same pickup and destination.
- Record the quoted currency, date and expiry date.
- Match container size, condition, quantity and unit-selection terms.
- Match the final delivery address and unloading method.
- Mark a missing line item as unknown; do not treat it as zero.
- Keep conditional charges beside the total rather than assuming they apply.
- Ask whether the offered date is an estimate or a confirmed appointment.
Advertised container prices in the UK
Prices published by sellers on the date shown, for one container, before delivery unless the row says otherwise. Use them to check whether a quote is in a plausible range; they are not ContainerPick offers and say nothing about stock near you.
| Container | Advertised price | Details |
|---|---|---|
| 20ft used | £875 | ex. VAT · checked 16 Oct 2026 |
| 20ft new / one-trip | £1,775 | ex. VAT · checked 16 Oct 2026 |
| 40ft used | £1,250 | ex. VAT · checked 16 Oct 2026 |
| 40ft new / one-trip | £3,625 | ex. VAT · checked 20 Oct 2026 |
| 40ft new / one-trip | £3,695 | tax not stated · checked 20 Oct 2026 |
| 40ft high cube, used | £1,175 | ex. VAT · checked 16 Oct 2026 |
| 40ft high cube, new / one-trip | £2,495 | ex. VAT · checked 16 Oct 2026 |
| Delivery (transport) | £200 | 20ft, Surrey hire area · per delivery, each way · ex. VAT · checked 16 Oct 2026 |
To compare written quotes, put the container, transport, unloading and tax of each offer in the same columns. An offer with an unpriced line cannot be ranked until that line is priced.
Check the terms attached to the total
Before payment, ask what is reserved, when payment is due, who invoices you and what changes if the unit or delivery is unavailable. Review cancellation, inspection, return and issue-reporting terms, including return transport costs where relevant.
Describe your project in the request builder and review the summary. You can send it with your consent, or copy or download it. The supplier confirms the unit, availability, complete price and delivery terms; a request does not reserve a container.
Compare sizes and quantities using complete offers
Ask for separate delivered offers if you are considering one 20ft, one 40ft or two 20ft units. Use the same condition requirements and explain each placement. Do not assume that twice the capacity means twice the price, or that two containers can arrive on one lorry.
Compare how each layout meets your storage and access needs alongside its complete budget. A smaller headline unit price does not settle the purchase when delivery or required site work differs.
Buying questions
How can I estimate my shipping container cost?
Start with a written offer for your size, condition, quantity and delivery address. Add required work you arrange separately, identify what is excluded and keep unknown amounts visible until priced.
Does a low container price include delivery?
Only if the written offer says so. Ask whether transport, unloading, placement, VAT and other fees are included.
How do I compare two quotes?
Compare offers for the same site, acceptable container and delivery work. Count included services once. Get missing required prices and list when extra charges apply. Compare complete totals, condition records, quote expiry dates and seller terms.
Are approvals and site preparation included in the delivered price?
Ask whether the work is included, excluded or yours to arrange. Add any required work you arrange yourself to the project budget, without counting it twice.
Where can I find the cheapest shipping container delivered to my postcode?
Request complete written offers for the same requirements and final site, then compare suitable units after delivery, unloading and applicable fees are included. Keep unpriced required work visible. That identifies the lowest complete offer you have checked, rather than guaranteeing the cheapest price in the market.
Is a cheap used container always better value?
Compare its condition and any required repairs with a suitable alternative. Include delivery and separately arranged work in both budgets. An unknown repair or transport amount prevents a complete cost comparison.
Should I enter zero when unloading is included?
Record unloading as included in the stated charge and do not add it again. If the offer does not say whether unloading is included, leave it unresolved and ask for confirmation.