To find the lowest complete shipping container cost, compare written offers for a unit that meets your needs at the same final site. Add the container, delivery, unloading and applicable required fees once, then budget separately for any necessary site work or repairs. An unpriced item leaves the comparison incomplete.

Prepare a quote request →
Illustrative purchase worksheet beside a shipping container.
Illustrative image.

Reading a New Zealand container quote: GST basis and exclusions

NZ sellers do not publish on one tax basis. One NZ yard lists its dry containers including GST with transport excluded, while another states that its prices are indicative estimates, plus GST, and exclude transport. The first yard also shows reefer prices plus shipping without stating GST. Read the tax column of each observation before ranking them.

IRD's method converts between the two: to add GST to an exclusive price, multiply it by 0.15 and add the result; to find the GST inside an inclusive price, multiply by 3 and divide by 23. A GST-registered business can claim back the GST it is charged on business purchases, so it compares ex-GST totals; a household compares the inclusive figure it will actually pay.

Expect site-dependent work to sit outside the container price. The Christchurch guide, for example, links property technical-category and flood information to a foundation design that is quoted separately from the empty container. Look for wording such as 'excludes transport' or '+ shipping' beside a headline price, and add each of those lines once.

Sources: Inland Revenue, Calculating your GST (checked 20 Oct 2026); Inland Revenue, Claiming GST (checked 20 Oct 2026).

Quote currency
NZD with GST status stated
Comparable total
Allocated unit + preparation + delivery + unloading
Local example
20ft GP one trip: NZ$4,600 incl. GST, Auckland August 2026 special

How to find the cheapest suitable container delivered

Start by defining what the container must do: the items it must hold, the condition you will accept, how you will use the doors and where it will be placed. A low price is useful only when the offered unit and delivery plan meet those requirements.

Give sellers the same requirements and site information. Ask for itemised, dated offers with current condition evidence or clear allocation and inspection terms. Compare the complete amounts among suitable offers, then resolve any unpriced required work before choosing.

Possible savingCheck before changing the request
Choose a smaller feasible formatConfirm the usable layout and access you need. Compare complete delivered offers; a smaller unit does not guarantee a lower delivered cost.
Choose a used unit suited to the jobCheck its actual condition and any required repairs. Compare the resulting budget with an acceptable one-trip or unused alternative.
Change delivery timingAsk whether a different window changes the written price. Record the revised terms instead of assuming a discount.
Collect from the depotPrice loading, road transport and unloading at your site. Confirm release arrangements and who is responsible at each step.
Remove optional extrasKeep work needed for your intended use in the budget. Price optional paint, shelving or modifications separately.

Look for the lowest complete cost among the suitable offers you have checked. A few quotes do not prove which supplier is cheapest across the whole market.

Ask for these line items

If one seller includes unloading and another excludes it, their headline prices are not yet comparable. Ask for a revised total using the same scope. Keep separately booked work in your overall budget.

Line itemWhat belongs in the written offer
ContainerSize, condition, quantity, unit selection and price per unit.
TransportThe charge to deliver to your final address, including any separately quoted transport fees.
Unloading and placementWhether taking the container off the truck and placing it at the agreed spot are included or priced separately.
Taxes and feesApplicable amounts or how they will be calculated; whether the displayed total includes them.
Optional workLockbox, repainting, shelving, repairs or modifications priced separately.
Conditional chargesWaiting time, difficult access, failed delivery, rescheduling or additional handling.

Separate the quoted total from your project budget

Add the confirmed purchase and delivery total to required work you book separately. Count each charge once: if unloading is already included in the delivered total, do not add it again. Keep estimates and unresolved amounts labelled until confirmed, and record a conditional fee with the event that would trigger it.

Budget categoryHow to record it
Confirmed quoted amountsContainer, transport, unloading and other required charges included in the written offer.
Work you arrange separatelySite preparation, supports, council consents or additional equipment; obtain a separate estimate where needed.
Unresolved amountsTaxes or required work not yet priced. Mark them unknown and resolve them before treating the budget as complete.
Conditional chargesWaiting, access failure or rescheduling; record the trigger and amount or rate separately.

Make the factors behind each quote explicit

Ask the seller how size, condition, quantity and unit selection affect the offer. If you compare used and one-trip units, ask for the actual condition terms and current photos of the unit or the selection process being offered.

Give each seller the same address and access information. Confirm what the delivery and unloading amount covers, then keep site preparation or other separately arranged work in the wider project budget.

Compare offers without hiding missing amounts

For purchases from different sellers, the dispatch locations can differ. Record each actual origin and its delivery charge; keep the final site and service requirements consistent. For quotations to move the same container you already own, use the same pickup and destination.

  • Record the quoted currency, date and expiry date.
  • Match container size, condition, quantity and unit-selection terms.
  • Match the final delivery address and unloading method.
  • Mark a missing line item as unknown; do not treat it as zero.
  • Keep conditional charges beside the total rather than assuming they apply.
  • Ask whether the offered date is an estimate or a confirmed appointment.

Compare the complete delivered price

Request an NZD quote for the actual size, height, condition and door arrangement. Compare the container, transport, unloading, any repairs and required site work, with GST clearly stated.

Check the terms attached to the total

Before payment, ask what is reserved, when payment is due, who invoices you and what changes if the unit or delivery is unavailable. Review cancellation, inspection, return and issue-reporting terms, including return transport costs where relevant.

Use the request builder to collect your requirements. Review the brief, then send it through the quote form with your consent, or copy or download it. The supplier confirms the unit and delivered price; a request does not place an order or reserve stock.

Compare sizes and quantities using complete offers

Ask for separate delivered offers if you are considering one 20ft, one 40ft or two 20ft units. Use the same condition requirements and explain each placement. Do not assume that twice the capacity means twice the price, or that two containers can arrive on one truck.

Compare how each layout meets your storage and access needs alongside its complete budget. A smaller headline unit price does not settle the purchase when delivery or required site work differs.

Buying questions

How can I estimate my shipping container cost?

Start with a written offer for your size, condition, quantity and delivery address. Add required work you arrange separately, identify what is excluded and keep unknown amounts visible until priced.

Does a low container price include delivery?

Only if the written offer says so. Ask whether transport, unloading, placement, GST and other fees are included.

How do I compare two quotes?

Compare offers for the same site, acceptable container and delivery work. Count included services once. Get missing required prices and list when extra charges apply. Compare complete totals, condition records, quote expiry dates and seller terms.

Are council consents and site preparation included in the delivered price?

Ask whether the work is included, excluded or yours to arrange. Add any required work you arrange yourself to the project budget, without counting it twice.

Where can I find the cheapest shipping container delivered to my postcode?

Request complete written offers for the same requirements and final site, then compare suitable units after delivery, unloading and applicable fees are included. Keep unpriced required work visible. That identifies the lowest complete offer you have checked, rather than guaranteeing the cheapest price in the market.

Is a cheap used container always better value?

Compare its condition and any required repairs with a suitable alternative. Include delivery and separately arranged work in both budgets. An unknown repair or transport amount prevents a complete cost comparison.

Should I enter zero when unloading is included?