Show the last approach
Measure gate clearance and identify turns, gradients, bridge limits and overhead obstructions. Ask the haulier to review the route for the actual vehicle.
Plan your container purchase in the UK.Compare quotes in £ for the same container and delivery services.
For an Omagh site, provide the final property route and the space for the delivery vehicle to turn. Clarify who supplies offloading equipment and whether the price includes placement in the agreed position. A standard 20ft shell has a nominal exterior length of about 6.06 m. Plan the retrieval aisle, doors and unloading footprint alongside that smaller storage format.

Use the full postcode, final address and site photographs for a firm written offer. Price depends on the offered unit, dispatch point, vehicle and unloading plan. For island transport or a dispatch route from Great Britain to Northern Ireland, agree sea transport and local offloading separately.
| Scope to agree | What the written quote should state |
|---|---|
| HIAB / lorry-mounted crane | The actual unit mass, lift position, reach, stabiliser footprint and supporting ground, assessed by the competent operator. A nominal container size does not guarantee a suitable lift. |
| Tilt-bed, sideloader or separate crane | The method proposed for this site, vehicle approach, unloading area, supplier of equipment and final placement responsibility. Availability is operator-confirmed. |
| Delivered total (£) | Unit price, transport, offloading, placement, VAT status and any ferry, waiting or failed-delivery charges, itemised on one scope. |
Confirm the actual property address, rural approach and unloading responsibilities. If the unit comes from Great Britain, identify transport arrangements and any documentation required with the supplier.
Measure gate clearance and identify turns, gradients, bridge limits and overhead obstructions. Ask the haulier to review the route for the actual vehicle.
Have a competent person assess the ground for the unloading method and container supports. Show drainage runs, covers, soft edges and any recent ground works.
Mark cargo-door direction, opening space and the retrieval aisle. Keep emergency access and shared working routes available after placement.
The operator must approve the site and lifting plan. A container footprint or postcode does not establish safe unloading.
National guidance checked .
Northern Ireland planning framework
Check the relevant council planning office for local development. Identify any separate building control review and give the actual location, intended use, duration and conversion details.
Authority for the actual property
Give the exact address, use, duration, height and alterations. Identify any protected designation, lease condition and public-road issue. A temporary label or postal town does not establish exemption.
Delivery and installation
Confirm the lifting plan, supporting ground and exclusion area with the unloading operator. Identify any separate electrical, plumbing, fire or building-control review for a conversion.
National guidance is a starting point. The responsible authority determines the requirements for your proposal; this guide does not establish site approval.
Browse delivery-planning guides for these areas. Listings are editorial guidance and do not identify depots, confirmed stock or supplier coverage.
Confirm the size, condition and intended use. Add the full postcode and access details before reviewing the request.