SINGLE TRUSS / WHITE PE

≈6.10 × 6.10 m (20 × 20 ft) Container Shelter

A compact covered bay with a white PE roof and a single truss galvanised steel frame.

£1,800–3,250

Indicative price. Prices in pounds sterling (£), including 20% VAT. Prices cover the conversion or kit described. Supporting containers, additional fit-out, site work, transport and installation are quoted separately.

  • Frame material and finish to confirm
  • Cover material and colour to confirm
  • Supporting containers sold separately
MAKE ROOM FOR YOUR PROJECT

Plan a compact 20 × 20 ft covered bay

A compact roof works best when it has one clear job. Draw the equipment, the person using it and the retrieval route before adding storage. The three concepts below show how the same nominal square roof can be organised around parking, materials or a modest work area.

This is the smallest nominal footprint in the five-kit comparison. If a walkway disappears when the machine is added, compare a wider model before ordering. Supporting containers, their doors and the approach need additional room outside the roof outline.

How to use these concept plans

Concept layouts based on a 20 × 20 ft nominal roof label. The drawing is not a verified clear bay, equipment capacity or installation drawing.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

Equipment shelter with a separate walkway

Place the equipment toward one side and keep a visible walkway beside it. Put accessories in the supporting container rather than filling the route around the machine. Mark the opening direction of service panels and any wide attachments when checking the selected roof profile.

20 × 20 ft nominal container-supported roof
Equipment shelter with a separate walkway — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Front approach continues beyond the roof outline.Open / download this plan
  • 01 · Parked equipment
  • 02 · Walking route

Site, equipment and services to resolve

  • Optional entry lighting

Ask your quote to cover

  • Full equipment envelope
  • Walkway and service access
  • Approach surface

One equipment position is illustrated, not a guaranteed vehicle fit.

Short-term materials and a picking route

Keep marked material zones on one side and leave an access strip for picking and inspection. Brief the supplier about the size of incoming loads and how they are carried. An open fabric roof offers overhead cover; moisture-sensitive stock may need a different enclosure or storage solution.

20 × 20 ft nominal container-supported roof
Short-term materials and a picking route — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
No rack loads or aisle widths are specified.Open / download this plan
  • 01 · Materials
  • 02 · Pick and retrieve

Site, equipment and services to resolve

  • Lighting if stock is handled after dark
  • Ground moisture and runoff plan

Ask your quote to cover

  • Stock size and storage requirements
  • Manual or mechanical handling
  • Open or protected rear end

Stack height, stock protection and handling method must be established separately.

Outdoor bench with a clear working area

Use a rear bench for a defined outdoor task and keep the front half flexible for the workpiece and operator. Show the bench depth and equipment leads before fixing positions. Discuss the activity itself, especially dust, exhaust or hot work, rather than asking only for a roof size.

20 × 20 ft nominal container-supported roof
Outdoor bench with a clear working area — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Furniture is an activity symbol, not included equipment.Open / download this plan
  • 01 · Bench zone
  • 02 · Operator and workpiece

Site, equipment and services to resolve

  • Tool and lighting schedule
  • Any task-specific extraction request

Ask your quote to cover

  • Task and workpiece sizes
  • Bench dimensions
  • Power and operating hours

A weather-covered task area is illustrated; suitability for the proposed work needs assessment.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

Assemble a compact 20 × 20 ft container shelter

Start with the compact support layout and the actual delivered frame, cover and mounting parts. Organise a clear ground-assembly area and front approach; the finished cover material and connection details come from this kit’s packing list and drawings.

Before delivery and roof assembly

  • Confirm that the selected supports and mounts are accepted for this exact short kit.
  • Keep enough clear space for the planned frame assemblies and lifting equipment.
  • Resolve the ground anchorage and any end-wall option before placing supports.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched single-truss frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    Short kits can still use different cover and mounting details.

    • Match the manual number and part marks to the delivered kit, including end fittings.
    • Keep the actual cover material and replacement reference in the record rather than substituting a similar-looking sheet.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    Even a compact roof needs space beyond the nominal square.

    • Use the short-kit mounting drawing for the support gap and diagonal references.
    • Mark the front approach, support-container door swings, runoff and ground-assembly area.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Prepare the designed base and anchorage, then secure the accepted short supports before fitting the roof.
    • Record levels across and along both supports, then recheck the mounting references.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    The mounting method must match this kit and the accepted support detail.

    • Lay out the identified rails or plates in the drawing order and check their orientation against the marked support references.
    • Complete only the accepted connection detail for this kit. Inspect the end and intermediate attachments, keep tensioning points accessible and restore the specified protection before raising frames.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Install all specified braces and finish the connection checks across the short roof.
    • Check that exposed fasteners and unfinished ends cannot rub the cover; fit the supplied protection.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    A small roof cover still needs controlled pulling and correct centring.

    • Spread the correct cover on a clean surface and identify its pockets and end orientation.
    • Pull it evenly over the checked frame in the manual’s working conditions; leave attachments adjustable until centred.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Fit the specified tension tubes, end lacing and corner straps to this cover.
    • Follow the supplied tensioning order and check even end overhangs before the final inspection.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    The compact installation still includes every anchor and cover attachment.

    • Check support anchors, rail connections, braces and the full cover edge.
    • Demonstrate the clear approach and record the actual PE or PVC cover’s care and retensioning instructions.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Draw the limiting item first

Draw the machine or materials at full size. Add room to walk around them and open panels. If they fit only when the access route is blocked, the compact layout will not work.

Set the front approach

Show where a trailer, pallet trolley or vehicle stops before entering. Keep the front container doors and any rear access in the same site sketch so the roof does not create a blocked corner.

Discuss the cover and exposure

Identify the proposed roof material and the weather the stock or task must be protected from. Ask for the matching replacement-cover reference and care instructions with the supplied model.

Request the complete compact installation

Coordinate supports, mounting, ground works and roof assembly. Ask the installer how much temporary space is needed for unpacking and lifting, even when the final roof is small.

Design decisions worth resolving early

Keep the size label separate from the usable bay

The square outline compares the 20 × 20 ft format; it does not specify the manufactured frame. Ask for actual mounting references, clear entry width and inside roof profile before arranging the supports or choosing the equipment position.

The containers add to the site footprint

The roof covers the space between the supports. Add the supporting boxes and access to their doors when measuring the whole installation against a boundary, driveway or neighbouring structure.

Keep the compact layout easy to retrieve

A tight bay can become impractical when accessories are placed behind the main item. Decide which objects are retrieved daily and give them an independent route or a place inside a support container.

Separate the bay surface from the roof

Tell the site contractor whether the work needs a cleanable, hard or simply drained surface. Agree ground preparation and any equipment supports separately.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • Equipment or stock dimensions
  • Daily access route and required side access
  • Support-container measurements and condition
  • Selected cover and exact kit model
  • Ground surface and runoff route
  • Front or rear enclosure request
  • Delivery, unloading, foundations and assembly responsibilities

Project questions

Will a vehicle fit under this 20 × 20 ft shelter?

Compare its full operating size with the selected model's finished opening, side profile and clear bay. Include mirrors, attachments and room to get in and out. The roof label alone cannot answer that question.

When should I compare the 26 × 20 ft option?

Compare it when the short roof length works but side-by-side equipment access feels constrained. Both labels have a 20 ft nominal depth; the wider label adds nominal width, while actual openings and mounting still require the selected drawings.

Is this a small enclosed workshop?

This is a covered bay. To make an enclosed workspace, also plan its use, walls, services and local checks. Specify the tools, ventilation and access needed so the proposal covers the work you intend to do.

Can I use it for moisture-sensitive stock?

Explain the required storage conditions before choosing the enclosure. Overhead cover does not define humidity control, wind-driven rain protection or a sealed ground surface. Ask the supplier to propose a system suited to that stock.

Plan your configuration

Choose what to include in the quote. Options are priced separately after model and site confirmation.

Specifications

Nominal roof width
≈6.10 m (20 ft)
Nominal roof length
≈6.10 m (20 ft)
Nominal roof plan
≈37.2 m² (400 sq ft)
Frame
Single truss
Frame material
Confirm the offered material and protective finish
Selected cover
Confirm the offered material, colour and product reference

What the base kit covers

ItemScopeDetails
Roof frameConfirmConfirm the offered frame type, material, protective finish and complete included-part schedule in the quote.
Roof coverConfirmConfirm the matching cover’s material, colour, product reference and included attachments in the quote.
Mounting hardwareConfirmExact feet, bracing, fasteners and anchors on the packing list.
Supporting containersSeparateExisting containers or separately supplied supports.
End walls & doorsSeparateModel fit, availability and finished opening to be quoted.
Freight & installationSeparateDelivery postcode, unloading, site work, assembly and applicable VAT.

Start with one compact covered zone

The ≈6.10 × 6.10 m (20 × 20 ft) nominal plan is the smallest kit in this comparison. Lay out your equipment and access space before choosing the supports.

Park and retrieve

Mark the parked equipment, the approach and the room needed to walk around it. Check the finished opening with mirrors, racks and attachments in place.

Choose the cover deliberately

The illustrated configuration uses a white PE cover. If you prefer PVC, request that exact material and its written price, replacement-cover reference and care instructions.

Compare width before length

The ≈7.92 × 6.10 m (26 × 20 ft) kit keeps the same nominal length and adds ≈1.83 m (6 ft) of nominal width. Compare the actual working aisle on the selected model’s layout.

≈6.10 × 6.10 m (20 × 20 ft) nominal dimensions

≈6.10 m (20 ft) wide × ≈6.10 m (20 ft) long gives a ≈37.2 m² (400 sq ft) nominal roof plan. Confirm the usable container gap, entry opening and inside roof profile on the exact model drawing.

Nominal plan
≈37.2 m² (400 sq ft)
Width basis
Nominal roof label
Clear opening
Exact model drawing
Support spacing
Exact mounting layout

Delivery and assembly

Roof-kit freight and container delivery are separate. Use the exact shipment and site layout to plan both.

Packed kit

Confirm the selected kit’s package count, weights and dimensions with the supplier before arranging transport or unloading.

Site and supports

Prepare the ground levels, drainage and access. Match the container arrangement, attachments and foundations to the selected roof.

Unloading and build

Agree who supplies lifting equipment and assembles the kit. Confirm lorry access, the assembly sequence and the delivered scope.

Assembly, care and warranty

Ask for and keep the documents for the exact frame and cover you are buying.

Assembly and parts

Matching assembly manual, complete parts list and support/mounting drawing.

Cover care

Model-specific tensioning, inspection and weather procedures, plus the correct replacement-cover reference.

Written warranty

Coverage for the frame and cover, exclusions, start date and claims process. A material lifespan label does not define a warranty.

Compare other kits

Questions

Should I choose ≈6.10 × 6.10 m (20 × 20 ft) or ≈7.92 × 6.10 m (26 × 20 ft)?

Compare the square and wider short layouts with the same equipment drawn in its operating position. Check the actual clear bay, side access and complete offered frame/cover scope for both; the nominal label does not identify the supplied cover.

Can I change the cover or add end walls?

State the cover material, colour and enclosure you need in the request. Confirm compatible cover, end-wall and door parts for the actual offered model, with finished opening dimensions and any price change.

What do I need for an installed price?

Add your delivery postcode, supporting containers, wall and opening requirements, access and assembly scope. The quote should separate kit supply, freight, unloading, supports, site work, installation and applicable VAT.

Build your request around this kit

≈6.10 × 6.10 m (20 × 20 ft) · Single truss · White PE. Add your site details and the options you selected.

Prepare my quote