A held batch or individual access
Describe which goods must be reached during the day. Marine T-floor loading needs its own airflow plan; an open aisle drawn for another floor does not establish a suitable loading pattern.
Describe what you need for your container purchase in Ireland. Compare written quotes that include the same work.
Compare standard and high-cube refrigerated storage on the same 40ft footprint. Select the height, then match the load, refrigeration equipment and delivery route.
Request a delivered quote
The supplier confirms the actual unit, working condition and delivery details.
Request a delivered quote
The supplier confirms the actual unit, working condition and delivery details.
These paired examples share an 11.602 × 2.276 m interior floor. High cube adds 305 mm (12in) of published inside height, while keeping the same floor length and width.
Swipe the table to see every column.
| Measurement | Length | Width | Height |
|---|---|---|---|
| Exterior, metric with imperial reference | 12.192 m (40 ft) | 2.438 m (8 ft) | 2.591 m (8 ft 6 in) |
| Exterior, metric | 12.192 m | 2.438 m | 2.591 m |
| Interior, metric | 11.602 m | 2.276 m | 2.226 m |
| Cargo-door opening | — | 2.276 m | 2.299 m |
Exterior, interior and cargo-door figures describe this one documented example. Door opening and interior height are separate measurements; confirm the actual unit, floor and load line.
Swipe the table to see every column.
| Measurement | Length | Width | Height |
|---|---|---|---|
| Exterior, metric with imperial reference | 12.192 m (40 ft) | 2.438 m (8 ft) | 2.896 m (9 ft 6 in) |
| Exterior, metric | 12.192 m | 2.438 m | 2.896 m |
| Interior, metric | 11.602 m | 2.276 m | 2.531 m |
| Cargo-door opening | — | 2.276 m | 2.603 m |
Exterior, interior and cargo-door figures describe this one documented example. Door opening and interior height are separate measurements; confirm the actual unit, floor and load line.
Describe which goods must be reached during the day. Marine T-floor loading needs its own airflow plan; an open aisle drawn for another floor does not establish a suitable loading pattern.
Specify the target temperature, outdoor conditions, batch size and door routine. Cooling warm arrivals or freezing a batch needs a separate duty assessment from holding already-cold stock.
Standard and high-cube examples have separate published equipment specifications. Confirm the actual machine, its nameplate and the site connection before delivery.
Swipe the table to see every column.
| Selection item | Confirm for the offered unit |
|---|---|
| Required temperature | Product requirement, incoming temperature, holding or pull-down duty, ambient conditions and door-opening routine. |
| Electrical connection | Nameplate voltage, phase, frequency, current and connector; have a qualified electrical contractor check the Irish site supply. |
| Operating cost | Metered kWh for a comparable duty, your energy tariff and any demand or fixed charges. |
These model-specific specifications do not guarantee an offered unit’s performance or daily electricity use. A converted single-phase freezer is a separate configuration. Use a representative operating test and metered kWh for the intended holding conditions.
Choose standard height when the packaged load fits its headroom; compare high cube for taller goods on the same floor, then verify door clearance, the load line and the long delivery approach.
The paired interiors are 2.226 m high for standard and 2.531 m for high cube. Their door openings are 2.299 m and 2.603 m high respectively. Doorway and interior heights are different limits.
Both dimension examples have an 11.602 × 2.276 m interior floor. Extra height leaves that floor unchanged; an arrangement that fits geometrically still needs the correct loading and airflow instructions.
The standard reference lists typical three-phase machinery options rather than one unit’s nameplate. The high-cube reference lists its own supply ratings. A voltage transformer with three-phase input does not establish single-phase compatibility.
Keep standard/high-cube selection attached to the delivered unit, its cooling equipment and its placement plan. The delivery operator and offered machinery determine the access requirements.
Request a current, itemised euro quote for the exact refrigeration unit and insulated box and Irish delivery address. An equipment price alone is not the delivered project total.
| Quote item | Confirm in writing |
|---|---|
| Equipment | Size, condition, identified unit, included fittings and availability at the time of enquiry. |
| Transport | Collection location, delivery Eircode or site address, route, timing, ferry costs where relevant, and any access restrictions. |
| Unloading and placement | HIAB or separate crane arrangements, lifting reach, ground assessment, waiting time and responsibility for the final position. |
| VAT and additional work | Confirm whether each amount includes VAT. Consumer-facing totals should include applicable VAT and unavoidable charges. Identify electrical work, supports and other excluded work separately. |
| Validity and payment | Written quote expiry, deposit, balance date, cancellation terms and the party taking payment. |
Include the cooling-unit model, a dated operating test, required temperature, power supply, alarms and service history. Obtain an electrician’s assessment of the supply and connection.
Irish stock, supplier coverage and final prices must be confirmed by the seller.
The installed 40ft rectangle is only part of the site plan. Confirm the delivery truck’s straight approach, turns, tilt clearance and unloading method, then set the doors and machinery-end access before placement.
The paired 40ft examples have the same 11.602 × 2.276 m interior floor. High cube adds 305 mm of published interior height. Check load height, doorway clearance and the actual unit’s load line.
One high-cube room adds height, without separate temperature zones. Give each product’s required conditions in the request; different temperatures may need separate equipment or a specifically designed arrangement.
Confirm the actual unit’s nameplate, voltage, phase, frequency, connector and circuit requirements against the Irish site supply. Have a qualified electrical contractor assess the installation before ordering; a domestic socket or a nominal container size does not establish compatibility.
Specify standard or high cube, working condition, cooling duty, site supply, delivery Eircode and unloading access. Ask for equipment, options, a dated refrigeration test, delivery, unloading, taxes and electrical setup as separate items.
Compare the cooling needs and delivery work together.
Specify the required temperature in °C, Euro-pallet or packaged load, operating routine, and site voltage, phase and frequency. Ask for the exact cooling-unit model, service record and a dated operating test.
Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.
Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.