Receiving and retrieval
Specify packaged dimensions, peak load and the items you need to reach. Confirm the door arrangement and airflow plan before relying on a pallet count.
Describe what you need for your container purchase in Ireland. Compare written quotes that include the same work.
Compact refrigerated storage for smaller loads and sites. Compare this standard-height cargo-door example, then specify the cooling duty, site power and delivered scope.
Request a delivered quote
The supplier confirms the actual unit, working condition and delivery details.
The example below is a nominal 3.048 m (10ft) × 2.438 m (8ft) × 2.591 m (8ft 6in) cargo-door container with an insulated interior and T-floor. Its machinery and insulation reduce the usable room.
Swipe the table to see every column.
| Measurement | Length | Width | Height |
|---|---|---|---|
| Exterior, metric with imperial reference | 3.048 m (10 ft) | 2.438 m (8 ft) | 2.591 m (8 ft 6 in) |
| Exterior, metric | 3.048 m | 2.438 m | 2.591 m |
| Interior, metric | 2.438 m | 2.235 m | 2.235 m |
| Cargo-door opening | — | 2.234 m | 2.248 m |
Exterior, interior and cargo-door figures describe this one documented example. Door opening and interior height are separate measurements; confirm the actual unit, floor and load line.
Specify packaged dimensions, peak load and the items you need to reach. Confirm the door arrangement and airflow plan before relying on a pallet count.
Describe whether goods arrive already chilled or frozen, or need cooling from warm. Give the batch size, arrival temperature and required completion time.
The cargo-door example uses three-phase supply. Portable designs have their own cooling equipment and connection requirements.
Swipe the table to see every column.
| Selection item | Confirm for the offered unit |
|---|---|
| Required temperature | Product requirement, incoming temperature, holding or pull-down duty, ambient conditions and door-opening routine. |
| Electrical connection | Nameplate voltage, phase, frequency, current and connector; have a qualified electrical contractor check the Irish site supply. |
| Operating cost | Metered kWh for a comparable duty, your energy tariff and any demand or fixed charges. |
Compare the exact offered model, required temperature duty and electrical installation scope before delivery.
Choose 10ft when a smaller packaged load fits the actual interior and you can provide the selected machine’s supply; compare a portable walk-in if frequent entry determines the door choice.
The standard-height example has a 2.438 × 2.235 × 2.235 m interior. Its 2.234 m-wide × 2.248 m-high opening is a separate measurement: passing the doorway does not establish usable storage height.
Use a loading plan for this cargo-door T-floor configuration. Portable door-specific pallet counts describe a different box and do not establish how items can be retrieved from the shorter cargo-door room.
Obtain the actual machine’s nameplate and installation instructions. Have a qualified electrical contractor confirm voltage, phase, frequency, current and connection requirements for the Irish site.
Keep the delivered box, refrigeration machine and condition evidence together. A compact footprint does not establish the machine’s working condition or the included service arrangements.
Request a current, itemised euro quote for the exact refrigeration unit and insulated box and Irish delivery address. An equipment price alone is not the delivered project total.
| Quote item | Confirm in writing |
|---|---|
| Equipment | Size, condition, identified unit, included fittings and availability at the time of enquiry. |
| Transport | Collection location, delivery Eircode or site address, route, timing, ferry costs where relevant, and any access restrictions. |
| Unloading and placement | HIAB or separate crane arrangements, lifting reach, ground assessment, waiting time and responsibility for the final position. |
| VAT and additional work | Confirm whether each amount includes VAT. Consumer-facing totals should include applicable VAT and unavoidable charges. Identify electrical work, supports and other excluded work separately. |
| Validity and payment | Written quote expiry, deposit, balance date, cancellation terms and the party taking payment. |
Include the cooling-unit model, a dated operating test, required temperature, power supply, alarms and service history. Obtain an electrician’s assessment of the supply and connection.
Irish stock, supplier coverage and final prices must be confirmed by the seller.
A smaller installed box can still arrive on a long delivery vehicle. Confirm the method for your address and leave room for doors, receiving and refrigeration service.
Confirm the actual unit’s nameplate, voltage, phase, frequency, connector and circuit requirements against the Irish site supply. Have a qualified electrical contractor assess the installation before ordering; a domestic socket or a nominal container size does not establish compatibility.
Use the actual pallet footprints, packaged dimensions and the proposed unit’s loading plan. Euro pallets commonly measure 1,200 × 800 mm. Check load height, door clearance, airflow, floor limits and retrieval space; a pallet count from an overseas model does not establish this unit’s capacity.
Compact size does not always mean a lower equipment price. Compare current Irish quotations for the actual unit, refrigeration equipment and delivered scope when both sizes fit.
Include the delivery Eircode, packaged load, door routine, target temperature, arrival temperature, site voltage and phase, condition preference and unloading details. Ask for a dated refrigeration test and the complete delivered scope.
Compare the cooling needs and delivery work together.
Specify the required temperature in °C, Euro-pallet or packaged load, operating routine, and site voltage, phase and frequency. Ask for the exact cooling-unit model, service record and a dated operating test.
Use a delivery Eircode where available, plus the town, county, access photographs and proposed position. New or unassigned sites can be described by a full address and location instructions. Ask the operator to assess lane width, bends, overhead lines, ground support and HIAB or crane placement.
Compare itemised euro offers with applicable VAT, delivery, unloading and required site work visible. Supplier coverage, stock and appointment dates need confirmation for the actual location.