A held batch or individual access
Describe which goods must be reached during the day. Marine T-floor loading needs its own airflow plan; an open aisle drawn for another floor does not establish a suitable loading pattern.
Prepare your Australian container request. Find the right price for your project.


Compare standard and high-cube refrigerated storage on the same 40ft footprint. Select the height, then match the load, refrigeration equipment and delivery route.
Request a delivered quote
The supplier confirms the actual unit, working condition and delivery details.
Request a delivered quote
The supplier confirms the actual unit, working condition and delivery details.
These paired examples share an 11.602 × 2.276 m interior floor. High cube adds 305 mm of published inside height, while keeping the same floor length and width.
Swipe the table to see every column.
| Measurement | Length | Width | Height |
|---|---|---|---|
| Exterior, metric | 12.192 m | 2.438 m | 2.591 m |
| Interior, metric | 11.602 m | 2.276 m | 2.226 m |
| Cargo-door opening | — | 2.276 m | 2.299 m |
These dimensions are examples for particular models. Check the offered unit’s measurements, openings, ratings and usable clearances before planning storage, transport or installation.
Exterior, interior and cargo-door figures describe this one documented example. Door opening and interior height are separate measurements; confirm the actual unit, floor and load line.
Swipe the table to see every column.
| Measurement | Length | Width | Height |
|---|---|---|---|
| Exterior, metric | 12.192 m | 2.438 m | 2.896 m |
| Interior, metric | 11.602 m | 2.276 m | 2.531 m |
| Cargo-door opening | — | 2.276 m | 2.603 m |
These dimensions are examples for particular models. Check the offered unit’s measurements, openings, ratings and usable clearances before planning storage, transport or installation.
Describe which goods must be reached during the day. Marine T-floor loading needs its own airflow plan; an open aisle drawn for another floor does not establish a suitable loading pattern.
Specify the target temperature, outdoor conditions, batch size and door routine. Cooling warm arrivals or freezing a batch needs a separate duty assessment from holding already-cold stock.
Standard and high-cube examples have separate published equipment specifications. Confirm the actual machine, its nameplate and the site connection before delivery.
Swipe the table to see every column.
| Operating requirement | What the supplier must confirm | Site confirmation |
|---|---|---|
| Holding temperature | Required setpoint, product temperature and dated test for the actual machine | Airflow, loading, insulation and door-opening routine |
| Cooling duty | Whether the unit can perform the required holding or pull-down duty | Incoming batch size and temperature; local ambient conditions |
| Electrical supply | Nameplate voltage, phase, 50 Hz compatibility, current and connector | Licensed electrician checks circuit, protection, earthing and any transformer |
Confirm the assigned unit’s nameplate voltage, phase, frequency, current and connector. Australian supply is nominally 230 V single phase or 400 V three phase at 50 Hz; a licensed electrician must confirm equipment compatibility, circuit protection and any transformer.
Choose standard height when the packaged load fits its headroom; compare high cube for taller goods on the same floor, then verify door clearance, the load line and the long delivery approach.
The paired interiors are 2.226 m high for standard and 2.531 m for high cube. Their door openings are 2.299 m and 2.603 m high respectively. Doorway and interior heights are different limits.
Both dimension examples have an 11.602 × 2.276 m interior floor. Extra height leaves that floor unchanged; an arrangement that fits geometrically still needs the correct loading and airflow instructions.
The standard reference lists typical three-phase machinery options rather than one unit’s nameplate. The high-cube reference lists its own supply ratings. A voltage transformer with three-phase input does not establish single-phase compatibility.
Keep standard/high-cube selection attached to the delivered unit, its cooling equipment and its placement plan. The delivery operator and offered machinery determine the access requirements.
Compare Australian proposals for the same temperature duty, condition, refrigeration equipment and delivery postcode.
Request a current written offer for the assigned unit. Confirm the dispatch depot, availability, applicable GST, transport, unloading and site work. A missing charge is unresolved, not zero.
| Configuration to quote | Equipment evidence | Australian price confirmation |
|---|---|---|
| Used refrigerated container | Unit and machine identity; box condition; dated temperature test; warranty terms | Current total in AUD including applicable GST |
| Used box with replacement refrigeration | Identify the box and replacement machine separately; 50 Hz compatibility; guarantees | Confirm equipment, delivery, unloading and site electrical costs |
| New or one-trip reefer | Actual condition, machinery specification, temperature duty and electrical nameplate | Supplier confirms availability and complete written scope |
Request the machine identity, a dated operating test at the required temperature and checks of alarms, defrost and door seals.
Compare insulation, floor, repairs and equipment age separately. A new motor can be fitted to a used box; request the warranty terms for each.
Have the quote separate equipment, any transformer or conversion, transport, unloading, taxes and site electrical work.
The installed 40ft rectangle is only part of the site plan. Confirm the delivery truck’s straight approach, turns, tilt clearance and unloading method, then set the doors and machinery-end access before placement.
The paired 40ft examples have the same 11.602 × 2.276 m interior floor. High cube adds 305 mm of published interior height. Check load height, doorway clearance and the actual unit’s load line.
One high-cube room adds height, without separate temperature zones. Give each product’s required conditions in the request; different temperatures may need separate equipment or a specifically designed arrangement.
Confirm the selected equipment is suitable for the Australian site supply: nominal 230 V single phase or 400 V three phase, 50 Hz. Have a licensed electrician check the nameplate, current, connection, protection and any transformer.
Specify standard or high cube, working condition, cooling duty, site supply, delivery postcode and unloading access. Ask for equipment, options, a dated refrigeration test, delivery, unloading, taxes and electrical setup as separate items.
Compare the cooling needs and delivery work together.