Check placement rules before preparing the site
Check whether the property is in England, Scotland, Wales or Northern Ireland. Before committing to a unit, ask the local authority about its use, position, duration, size and site work. A movable container or short stay does not automatically remove the need for permission. Planning and building requirements are separate.
- England: planning permission guidance
- Scotland: development management
- Wales: planning permission
- Northern Ireland: planning permission
Also check lease conditions, access rights, designated areas, drainage and any consent needed for groundworks. Give the authority a site plan and intended-use description; do not infer an exemption from a supplier brochure.
Record the site details for the delivery operator
Draw the route from the street through the entrance to the placement area, including the lorry’s exit. Number the photos to match the sketch, record when they were taken and note whether the ground was wet or dry. Ask the operator which measurements they need and how to record them.
| Area | Record | Ask the operator |
|---|---|---|
| Approach and entrance | Street views from both directions, gate posts, turns and narrow points | Which access and turning measurements do you need for your vehicle? |
| Travel and setup ground | Surface type, slopes, pavement edges, soft spots and recent excavation | Can the equipment travel and set up here, or is a site assessment needed? |
| Overhead and below-ground features | Visible wires and branches; known utilities, tanks, drains or voids marked on the sketch | Who will review these hazards and any utility coordination? |
| Final container position | Container outline, door end, nearby structures and intended access | Can this position be reached with the proposed unloading method? |
Discuss ground conditions and support
Mark two areas on the sketch: where the delivery equipment will travel and set up, and where the container will remain. Have each reviewed for its own load and purpose. A support plan for the container does not establish that the lorry or lifting equipment can use the same ground.
Have the competent lift planner assess the ground for the actual crane or lorry loader, container mass, lifting radius and outrigger loads. Include slope, drainage, soft areas and known underground services or voids. Work-related lifting must be planned, supervised and carried out safely under the applicable rules; agree the responsibilities and required ground preparation with the operator before dispatch.
Ask who specifies the container's final supports for its condition, stored load and intended use, and who checks the completed preparation. For a permanent, modified or occupied installation, involve the relevant local authority and qualified design professional. Get the support and anchoring requirements before ordering blocks, gravel or concrete.
For work-related operations, use HSE lifting guidance for Great Britain; HSE overhead-line guidance; HSENI work-equipment guidance for Northern Ireland. Confirm the rules for the site and job with the responsible operator.
Record drainage before choosing support materials
Photograph standing water and note where runoff crosses the route or placement area after rain. Include nearby drains, recent grading and places that stay soft. Show these observations to whoever evaluates the ground and final supports; a dry-day photo leaves those questions unanswered.
Ask how the placement and site work will manage water around the container. Check whether local drainage approval is needed. Confirm any levelling or drainage work with the responsible authority or professional before changing the site.
Have overhead obstacles reviewed for the unloading movement
Mark power lines, branches and other overhead obstacles around the setup area as well as along the route. Review them against the proposed equipment movement, container and rigging. A truck passing beneath a line does not establish that unloading there is safe.
Identify overhead electricity lines on the route and around the lifting area. Assume they are live unless their owner confirms otherwise. The lift planner must consult the line owner about safe working arrangements and clearances for the actual equipment and movement. Avoid the hazard or arrange appropriate isolation, diversion or other agreed controls; a single distance does not establish safety for every line.
Agree on door direction and the final position
- Show which end should have the doors and where users will approach them.
- Check the room needed to open the doors and move your stored items.
- Point out nearby fences, buildings, drains and other limits on placement.
- Ask whether the operator can place the unit at that exact spot with the proposed equipment.
- Keep the agreed door direction and support locations on the final sketch.
Prepare a delivery-day handoff
Have the site contact, gate access, reviewed sketch and preparation instructions ready. Confirm who checks the supports and where people should stay while unloading. Clear the route agreed with the operator.
Recheck the site before dispatch. If rain, excavation, parked equipment or a changed placement affects the plan, send updated photos and ask the operator to review the change before arrival. Keep unresolved access, ground or placement questions visible to the seller and operator.
Buying questions
How much space should I leave for container delivery?
Ask the actual operator for the requirements of their vehicle and unloading method. Record the approach, turns, setup area, overhead obstacles and exit. The container's length and width do not describe the equipment's working space.
Do I need a concrete slab or blocks?
Have the final support arrangement specified for the ground, container condition, intended load and use. Ask who designs and checks it before purchasing materials. This checklist does not prescribe a slab, gravel depth or block size.
When should I decide which way the doors face?
Include that direction in the placement sketch before booking. Ask the operator whether the proposed vehicle and unloading method can achieve it.
Do I need planning permission for a storage container?
Ask the authority responsible for your address. Rules and exceptions depend on local requirements, use, duration, size and location. A shipping specification is not permission to place the container there.
Does driving under a power line mean unloading is safe there?
No. Flag lines in the route and placement sketch. Ask the delivery or lift provider to evaluate the equipment, container and unloading movement, and coordinate with the utility owner as needed.
