10 FT, 20 FT & 40 FT REEFERS

Refrigerated Shipping Containers for Sale

Choose refrigerated storage for your New Zealand site by usable room, packaged load, holding temperature and the actual refrigeration machine. Compare metric model examples, confirm 50 Hz site compatibility and request a tested unit with its full NZD scope and GST stated.

Illustration of a white refrigerated shipping container with its cooling unit visible.
Illustrative image.
Formats
10ft, 20ft and 40ft NZ configuration examples
Site supply
50 Hz compatibility and machine nameplate to confirm
Temperature
Chiller and freezer specifications differ by machine
Load plan
Actual packaged pallets, airflow and access
START WITH THE RIGHT FORMAT

Choose a refrigerated format for the actual load

Illustration of a nominal 10ft refrigerated container. Confirm the offered configuration.

10ft refrigerated

Compact cold-storage configuration.

Confirm its door opening, internal room and refrigeration duty.

View 10ft details →
Illustration of a nominal 20ft refrigerated container. Confirm the offered configuration.

20ft refrigerated

Compare ISO, high-cube and pallet-wide configurations.

Match the actual model and power connection to your site.

View 20ft details →
Illustration of a nominal 40ft refrigerated container. Confirm the offered configuration.

40ft refrigerated

Compare standard and high-cube configurations.

Confirm usable room, loading access and the allocated machine.

View 40ft details →

Compare usable interior space, door access and the refrigeration duty before choosing a nominal length. A 10ft compact chiller, a 20ft ISO reefer and a 20ft pallet-wide High Cube are different configurations; a length label does not establish temperature range or electrical supply.

For a New Zealand site, confirm the machine nameplate, 50 Hz compatibility, phase, current and connection. Document the actual packaged pallet dimensions and airflow clearance, then compare a tested configuration and the full delivered NZD quote with GST stated.

PLAN YOUR LOAD

Plan packaged loads, airflow and access

Use the actual packaged load. The NZ blue-pallet reference is 1,200 × 1,000 mm; an Australian pallet is a different 1,165 × 1,165 mm footprint. Allow for wrapping, airflow and retrieval; container length alone cannot establish a safe pallet count.

Ordinary examples with a 2.29 m interior width cannot fit two 1.165 m Australian pallet widths side by side. A 2.39 m pallet-wide box is a separate configuration; it still needs the manufacturer’s clearance and airflow plan.

For NZ 1.2 × 1.0 m pallets, sketch the actual orientation, wrapping and removal sequence in the offered unit. Reserve machinery-end and door clearance plus an aisle where goods need individual access. Do not treat every geometric position as validated storage.

Compare the complete refrigerated-container quote

Confirm the actual unit, refrigeration equipment, operating test and warranty. Ask for the full NZD total with GST, transport, unloading, electrical work and commissioning clearly identified. A non-operational insulated shell does not provide active cooling.

CHECK YOUR SITE POWER

Match chilled or frozen duty to 50 Hz site power

Separate supplier configurationPublished rangeConnection example
Single-phase chiller range0°C to +20°C15 A / 240 V supplier rating
Three-phase refrigerated range−25°C to +20°C32 A / 415 V supplier rating

New Zealand sites use 50 Hz electricity, with nominal 230 V single-phase and 400 V three-phase supplies. Have an electrician match the actual machine’s voltage range, phase, 50 Hz compatibility, current, connector and circuit to the site before delivery.

The ranges below belong to a documented local supplier range. A separately sourced or converted unit needs its own nameplate, operating test and temperature specification. Single-phase chilled storage does not establish frozen-storage capability.

A selectable setpoint does not establish pull-down speed or the time to freeze a warm batch. Specify incoming temperature, batch mass, target temperature and required completion time.

UNDERSTAND RUNNING COSTS

Estimate running cost from measured NZ operation

Ask for measured kWh over a representative period for the proposed machine, load, ambient conditions and door routine. Use the energy price on your own New Zealand tariff, including its GST basis.

Energy charge = measured kWh × your NZD/kWh tariff. Add any relevant fixed or capacity charges separately. Nameplate amperage and one maximum operating point cannot establish a daily bill.

Compare monitoring, alarms, service arrangements and breakdown response in the written scope. A device with remote connectivity does not establish a supplied subscription or a monitored response service.

CHECK THE SPACE INSIDE

Compare actual metric dimensions

NZ format exampleOutside L × W × HInside L × W × HDoor W × H
10ft HC2.99 × 2.44 × 2.9 m2.28 × 2.29 × 2.59 m1.79 × 2.46 m
20ft HC single phase6.06 × 2.44 × 2.9 m5.19 × 2.29 × 2.59 m1.79 × 2.46 m
20ft GP ISO6.06 × 2.44 × 2.6 m5.45 × 2.29 × 2.28 m2.29 × 2.26 m
20ft HC pallet wide6.06 × 2.5 × 2.9 m5.45 × 2.39 × 2.57 m2.39 × 2.53 m
40ft HC ISO12.2 × 2.44 × 2.9 m11.6 × 2.29 × 2.57 m2.29 × 2.54 m
40ft GP standardConfirm exact exterior11.554 × 2.29 × 2.238 m2.29 × 2.204 m

These NZ-market model examples have separate doors, insulation and equipment. Confirm the allocated unit, floor, marked load line and finished doorway before loading.

A walk-in configuration and a marine cargo-door reefer can share a nominal length while having different usable room. Keep each model’s dimensions and operating requirements together.

COMPARE WHAT IS INCLUDED

Plan unloading, electrical connection and machinery access

Give the operator the full address, suburb/town, region and postcode, with access photographs. Confirm HIAB or swinglift delivery, the actual unloading side, door direction, overhead services, firm ground and the complete placement scope.

Leave the refrigeration end clear for ventilation and maintenance to the assigned machine’s instructions. Arrange any site connection, commissioning and safe access before the unit arrives.

Moving an empty cold-storage box is separate from transporting cold goods under power. Agree on the transport duty, load and power arrangements with the actual operator.

PLAN THE HANDOVER

Receive the unit with its operating and service records

Match box and machine identifiers to the quote, condition photographs and test report. Check the floor, doors, seals, insulation and any repairs at delivery.

Ask for operation and alarm demonstrations, emergency release where provided, defrost/temperature controls and safe access. Keep the operating instructions, service arrangements and written warranty scope.

YOUR NEXT STEP

Prepare the same brief for every supplier

Give the operator the full address, suburb/town, region and postcode, with access photographs. Confirm HIAB or swinglift delivery, the actual unloading side, door direction, overhead services, firm ground and the complete placement scope.

State size, condition, intended use, quantity, preferred delivery date and any fittings. Request unit photos and the complete delivered amount in NZD, with GST, inspection, unloading and extra access costs itemised.