10 FT, 20 FT & 40 FT REEFERS

Refrigerated Shipping Containers for Sale

Compare 10ft, 20ft and 40ft refrigerated containers by usable space, temperature duty, site power and installed scope. Add your load and delivery postcode to a quote request, then confirm the offered unit’s specification and availability.

Illustration of a white refrigerated shipping container with its cooling unit visible.
Illustrative image.
Pallets
1165 × 1165 mm; confirm the loading plan
Power
Confirm the actual machine’s voltage, phase, 50 Hz compatibility and connection with a licensed electrician
Price
Written Australian quote in AUD including GST
START WITH THE RIGHT FORMAT

Choose 10ft, 20ft or 40ft from the load and access routine

Illustrative 10ft standard-height refrigerated container exterior with length, width and height annotations.

10ft

A small on-site inventory or a constrained placement area.

Door configuration can change pallet positions. Small size alone does not establish household-outlet compatibility.

View 10ft details →
Illustrative 20ft standard-height refrigerated container exterior with length, width and height annotations.

20ft

A moderate pallet inventory with regular receiving.

Reserve retrieval and loading access before treating every advertised position as usable storage.

View 20ft details →
Illustrative 40ft standard-height refrigerated container exterior with length, width and height annotations.

40ft

A larger batch held at temperature.

More floor length requires a loading and retrieval plan. Compare standard height with high cube; energy use does not follow a fixed 2× rule.

View 40ft details →

Holding already chilled or frozen goods is a different duty from cooling warm arrivals or freezing a batch. State the incoming temperature, quantity and completion time when that work is required. An insulated shell without working refrigeration provides no active temperature control.

PLAN YOUR LOAD

Plan Australian pallet loading

Plan with the Australian 1165 × 1165 mm pallet footprint and the dimensions of your actual packaged load. Confirm interior and door clearance, loading pattern, airflow, weight and operational space with the supplier; nominal length does not guarantee capacity.

Overseas portable model examplePublished inside floor, L × WAustralian pallet planAccess and airflow
Portable 10ft example2.337 × 2.235 mObtain a dimensioned loading planConfirm load line, air paths and retrieval
Portable 20ft example · three phase5.410 × 2.235 mObtain a dimensioned loading planConfirm load line, air paths and retrieval
Portable 40ft example11.582 × 2.235 mObtain a dimensioned loading planConfirm load line, air paths and retrieval

These dimensions are examples for particular models. Check the offered unit’s measurements, openings, ratings and usable clearances before planning storage, transport or installation.

Confirm the actual loading plan

Australian 1165 by 1165 mm pallet footprint and loading clearance checklist; capacity requires an actual loading plan.
Australian pallet footprint and loading checklist. Confirm the complete packed load and actual offered equipment; the drawing is not a pallet-count guarantee.
How leaving room for airflow changes the layout

Keep the unit’s designated floor air channels, return-air path and load line clear. Include pallet overhang, wrapping, package height, handling and retrieval in the loading plan. A floor rectangle that fits geometrically does not establish a suitable refrigeration layout.

BUDGET THE EQUIPMENT

Compare Australian reefer quotes by actual equipment and scope

Compare Australian proposals for the same temperature duty, condition, refrigeration equipment and delivery postcode.

Configuration to quoteEquipment evidenceAustralian price confirmation
Used refrigerated containerUnit and machine identity; box condition; dated temperature test; warranty termsCurrent total in AUD including applicable GST
Used box with replacement refrigerationIdentify the box and replacement machine separately; 50 Hz compatibility; guaranteesConfirm equipment, delivery, unloading and site electrical costs
New or one-trip reeferActual condition, machinery specification, temperature duty and electrical nameplateSupplier confirms availability and complete written scope

Request a current written offer for the assigned unit. Confirm the dispatch depot, availability, applicable GST, transport, unloading and site work. A missing charge is unresolved, not zero.

CHECK YOUR SITE POWER

Confirm the Australian supply and temperature duty

Confirm the assigned unit’s nameplate voltage, phase, frequency, current and connector. Australian supply is nominally 230 V single phase or 400 V three phase at 50 Hz; a licensed electrician must confirm equipment compatibility, circuit protection and any transformer.

Operating requirementWhat the supplier must confirmSite confirmation
Holding temperatureRequired setpoint, product temperature and dated test for the actual machineAirflow, loading, insulation and door-opening routine
Cooling dutyWhether the unit can perform the required holding or pull-down dutyIncoming batch size and temperature; local ambient conditions
Electrical supplyNameplate voltage, phase, 50 Hz compatibility, current and connectorLicensed electrician checks circuit, protection, earthing and any transformer

A controller setpoint or documented product range does not establish performance at your site's ambient conditions, loading or door-opening routine. Request the operating limits and a duty assessment for the actual refrigeration machine; confirm any required holding or pull-down performance separately.

UNDERSTAND RUNNING COSTS

Does a 40ft reefer use twice the electricity of a 20ft?

Electricity use depends on the refrigeration system, temperature setting, weather, load and door openings. Compare measured consumption for the same operating duty rather than applying a size-only ratio.

Information to requestHow to use it
Metered energy in kWhUse a representative holding period with the intended temperature, load and door routine.
Electricity tariffApply your actual energy rate and identify demand charges, fixed fees and taxes separately.
Cooling capacity and electrical inputKeep heat-removal capacity separate from electricity consumption; confirm both for the actual selected unit.

Energy cost = metered kWh × the applicable price per kWh. Record warm-load cooling separately from holding operation.

Ask the supplier and licensed electrician to confirm the actual unit’s nameplate, site-supply compatibility, connection and installation requirements. Include maintenance and any generator fuel separately in the operating budget.

CHECK THE SPACE INSIDE

Compare marine 20ft, 40ft standard and 40ft high cube separately

These manufacturer examples are different products from the portable fleet above. Dimensions are nominal; prepare a pallet and retrieval layout for the actual marine unit rather than transferring a layout from another model.

Marine product exampleInside L × W × H, metresDoor W × H, metres
Marine 20ft example5.321 × 2.235 × 2.248 m2.235 × 2.248 m
Marine 40ft standard example11.602 × 2.276 × 2.226 m2.276 × 2.299 m
Marine 40ft high cube example11.602 × 2.276 × 2.531 m2.276 × 2.603 m

These dimensions are examples for particular models. Check the offered unit’s measurements, openings, ratings and usable clearances before planning storage, transport or installation.

The high-cube example adds interior height, while its floor length and width match this standard-height example. Use the proposed unit floor, doorway and load line for a packaged-load plan; dry-container dimensions are not a reefer specification.

COMPARE WHAT IS INCLUDED

Compare the actual unit and its delivered scope

A non-operating reefer or NOR shell is not a working refrigerated purchase. For a used working unit, match condition photos, the machinery identity and the dated test report to the offered container. A PTI can include cooling and heating checks; review the procedure, results, skipped checks and repairs. A display photo shows one reading, rather than the temperature history or the performance of your load.

Have the quote itemise the shell and refrigeration, testing or repairs, delivery and placement, electrical equipment and setup, and taxes. Separate shell warranty from refrigeration warranty. Give the delivery operator the postcode, approach and placement photos, unloading access and door orientation; retain access to the machinery for service. Moving an empty reefer is a different arrangement from carrying cold goods under power.

PLAN THE HANDOVER

Plan the operating handover

Before taking over the installed container, agree on the operating conditions, records and named contacts below. Confirm which recording and notification functions are included in the delivered configuration.

Handover itemEvidence to keepPerson to name
Unit identity and handover fileContainer and refrigeration identifiers; document list and unresolved items.Person handing over the equipment; person accepting the file.
Operating conditions and site checksAgreed duty, load, ambient and door-use assumptions; completed check record and outstanding conditions.Person completing the checks; person accepting the operating conditions.
Sensors and stored historyRecorded sensor or channel and its location; logging settings, retention period, and whether and how records can be exported.Person checking readings and keeping the records.
Remote notification, if suppliedInstalled alert capability, connectivity and power-loss behaviour; named recipient and confirmation that the agreed notification reaches them.Person verifying notification delivery; alert recipient.
Response to an alarm or failureNamed response owner, contact route and agreed action; note any service arrangements still unresolved.Operating contact; person responsible for intervention.
Loss of refrigeration or site powerAgreed contingency for the stored goods, including any alternative storage or power arrangement; record unresolved arrangements.Person authorised to activate the contingency.

A displayed reading or stored history does not establish that an alert has reached someone who will act on it. A recorder battery does not establish refrigeration backup power.

YOUR NEXT STEP

Prepare a request with your format and temperature duty

Choose a format and chilled or frozen holding duty below to keep both in the editable request notes.

40ft standard

40ft high cube

Add your load, required temperature, site power and delivery details. Review the format and intended-use selections before sharing the draft. The request builder prepares a draft you can edit, copy or download. Review the request and submit it online with your consent. You can also keep a copy.