CONTAINER SHELTERS & CANOPIES

Shipping Container Shelters & Canopies

Plan a covered bay around your equipment, daily access and New Zealand site conditions. Nominal roof formats below are comparison concepts; request a locally supplied design, matching mounts and support containers, and a full NZD quote with GST and installation scope stated.

5 roof kits6.096–18.288 m nominal widthsPE or PVCSelected cover by kitOpen or enclosedEnd walls quoted separately
Original realistic concept illustration of an open fabric roof spanning two parallel navy shipping containers on a level yard.
Original concept illustration. Final roof, mounting and supporting-container arrangement depend on the selected model and site.
MAKE ROOM FOR YOUR PROJECT

Compare shelter layouts before choosing the roof size

A container shelter gives you a covered bay between supporting containers. Start with the movement through that bay: parking, picking stock or working around equipment. The most useful roof size is the one that leaves the required access route after the equipment is drawn in.

These three concepts show a compact parking bay, a deeper storage operation and a wider work area. They are options for briefing a supplier, rather than a promise that a particular vehicle, rack or workshop task is suitable for every roof kit.

How to use these concept plans

Concept site plans. Outlines use nominal roof labels; verified support spacing, entry openings, heights and overall site area come from the selected model.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

20 × 20 ft: park and retrieve

Use a small roof plan for one defined piece of equipment and its retrieval route. Keep the front approach open and place loose accessories in a supporting container. Before choosing the compact kit, draw the equipment at its full operating size rather than its transport dimensions.

20 × 20 ft nominal container-supported roof
20 × 20 ft: park and retrieve — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Keep the approach beyond the lower edge of the roof outline clear.Open / download this plan
  • 01 · Equipment
  • 02 · Walkway

Site, equipment and services to resolve

  • Optional task light
  • Drained ground surface

Ask your quote to cover

  • Equipment dimensions with attachments
  • Open-end access
  • Existing or supplied supports

No vehicle count is assumed; equipment and clear openings must be checked.

33 × 40 ft: storage with a retrieval aisle

Arrange materials beside a continuous route so an item near the rear can be reached without emptying the whole bay. Use the longer plan to separate receiving from stored stock. Any racks, handling equipment and end-wall openings need to be shown on the same layout.

33 × 40 ft nominal container-supported roof
33 × 40 ft: storage with a retrieval aisle — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Aisles are diagrammatic and have no prescribed width.Open / download this plan
  • 01 · Stored materials
  • 02 · Retrieval aisle
  • 03 · Receiving and sorting

Site, equipment and services to resolve

  • Stock-area lighting
  • Drainage and ground surface

Ask your quote to cover

  • Stock dimensions and handling method
  • One-way or through access
  • Requested enclosure and door dimensions

Rack capacity, stack height and handling clearances are separate design inputs.

60 × 40 ft: equipment plus work zones

Start the wide peak-roof plan with a central route and work areas on either side. Draw machines in use, not just parked. The supplier can then check the roof shape, supports and walls before the installer plans lifting and assembly.

60 × 40 ft nominal container-supported roof
60 × 40 ft: equipment plus work zones — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Double truss and a wider nominal span do not state a load rating or approved use.Open / download this plan
  • 01 · Equipment work zone
  • 02 · Movement route
  • 03 · Staging and storage

Site, equipment and services to resolve

  • Proposed machinery services
  • Task-light layout
  • Surface and drainage plan

Ask your quote to cover

  • Operating envelopes and heights
  • Complete roof/support model
  • Installer staging and lifting access

The peak profile and end opening must be checked along the full equipment route.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

How to prepare and assemble a container-supported shelter

Prepare the supports, identify the frame parts, establish a stable first bay and then fit the matching cover. Use the selected kit’s erection plan to decide which sections are assembled on the ground, how they are lifted and when temporary restraints can be removed.

Before delivery and roof assembly

  • Choose open or enclosed ends before the complete support system is reviewed.
  • Confirm the actual supplier’s assembly manual and cover-care instructions.
  • Prepare the ground, unloading area, access equipment and planned erection responsibilities.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched roof-frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    The nominal size does not identify the mounting or erection system.

    • Check the frame type, cover type, end-wall option and drawing revision against the delivery.
    • Sort parts into mounting, frame, purlin, bracing and tensioning groups; photograph shortages before erection.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    The useful bay and the temporary assembly area are different footprints.

    • Mark the drawing’s support references, not the nominal roof width; check levels and diagonals.
    • Keep unloading, ground assembly, lifting access, drainage and everyday container-door access visible on the site plan.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Prepare the designed foundations and anchorage, then place the accepted support containers on their agreed references.
    • Record both support heights, levels and condition before installing roof attachments.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    Clamps, rails and welded plates are different systems.

    • Lay out the actual rails or plates in their marked orientation, including left/right ratchet positions.
    • Complete the selected connection detail and inspect it before loading it with a raised frame.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Complete every specified purlin row, brace, clip and connection check.
    • Inspect bolts, edges and prescribed protection at every fabric-contact position.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    The large loose cover must stay controlled until its attachments are complete.

    • Select the manual’s weather conditions, clear the pulling route and lay the cover on a clean protected surface.
    • Use the specified pulling arrangement to distribute it evenly; check direction, pockets and end overhang before final fastening.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Install tension tubes and the actual edge/corner attachments in the supplied cover sequence.
    • Adjust tension progressively as instructed, and install matching enclosure parts only within the reviewed configuration.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    Completion includes the supports, cover and future inspections.

    • Walk the complete route from anchors to roof, recording mounting, frame and cover checks.
    • Demonstrate access and any doors; record inspection, retensioning and model-specific weather actions for the operator.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Measure equipment in its largest working position

Record the highest, widest and longest positions of the equipment, including mirrors, raised attachments, opened panels and the handling machine. Photograph the approach and note whether movement is one way or through the bay.

Plan access and weather protection

Choose open ends, one protected end or a request for both end walls. Explain what needs protection from wind-driven rain and where ventilation or frequent vehicle access matters. Compare matching doors by their finished openings.

Match roof and supports

Ask for one coordinated drawing showing containers, attachment references, roof profile, foundations and anchors. Include existing boxes in that review instead of assuming their nominal length is the only compatibility check.

Schedule a complete installation

Agree the sequence for ground preparation, container placement, kit unloading and roof assembly. Leave enough working room for the installer's lifting method and identify what can remain clear while the yard continues operating.

Design decisions worth resolving early

Ask for the mounting references and clear bay

On one drawing, identify the roof outline, the exact mounting references and the clear distance between supports. These are different measurements. Set out the supports from the mounting drawing, then check the usable bay against the equipment layout.

Record both support heights

Measure both supporting containers at the proposed mounting positions. Include their levels, condition and any height difference in the roof and end-wall request; a container-size name does not establish the finished opening.

Check the roof section along the equipment route

Put the tallest equipment position, open panels and raised attachments on the selected roof section. Check the approach, end-wall opening and the lower edges of the roof as well as its centre. Compare usable space rather than rounded size names.

An open shelter still has a ground plan

Draw the surface, runoff path, adjacent buildings and approach space. State how the bay will be kept usable after rain and how stored items will be moved without blocking container doors.

Include powered tools and equipment in the plan

If the bay is used for machines or maintenance, tell the supplier about noise, exhaust, dust, hot work and any proposed extraction. A roof-only quotation cannot resolve these activity-specific needs.

Compare the complete installation, including the kit

Put roof supply, mounts, containers, ground work, engineering, freight, lifting, assembly, end walls and taxes on separate lines. Ask for the exact drawing revision and written inclusions attached to the offer.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • Delivery location and marked site plan
  • Equipment sizes, operating heights and movement route
  • Preferred nominal roof size and exact model to confirm
  • Support-container length, height, condition and photographs
  • Open ends, partial wall or requested door openings
  • Ground preparation, drainage and available working area
  • Kit, mounts, supports, freight, lifting and assembly

Project questions

Should I choose roof width or roof length first?

Start with the movement that needs the most room. Width matters when equipment, a walkway and working space must fit side by side. Length matters when goods move from receiving to storage and retrieval. Compare both on a scaled plan. More area does not guarantee a useful route.

Can a shelter be fully enclosed?

Ask for walls and doors that suit the kit, with a complete support design. Explain the work and ventilation needed. End walls change the installation, so include them in the original model selection and site plan.

Is the nominal roof width the clear distance between the boxes?

Do not assume so. Attachment positions, frame profile and support arrangement vary. Ask for the inside-to-inside gap, mount references and clear entrance marked on the selected model drawing.

Should I order the supporting containers first?

Coordinate them with the selected roof and mounting layout. If containers are already on site, share their measurements and condition. Fixing the spacing before the roof is selected can create avoidable repositioning and foundation work.

FIVE SIZES · TWO FRAME CONFIGURATIONS

Find your roof kit

Each nominal format needs its own locally supplied design, engineering and itemised quote. An imported roof-kit price cannot price a complete New Zealand installation.

Original studio concept rendering of a white PE container-supported shelter, with a simple arched frame.
Single truss

6.096 × 6.096 m

A compact covered bay with a white PE roof and a single truss galvanised steel frame.

White PE37.161 m² nominal
Indicative price · roof kit onlyNZ$3,700–7,000
View kit →
Original studio concept rendering of a grey PVC container-supported shelter, with a simple arched frame.
Single truss

7.925 × 6.096 m

More nominal width with a short roof length: single truss galvanised steel and a grey PVC cover.

Grey PVC48.31 m² nominal
Indicative price · roof kit onlyNZ$5,500–10,000
View kit →
Original studio concept rendering of a grey PVC container-supported shelter, with a simple arched frame.
Single truss

10.058 × 12.192 m

A deeper roof plan for equipment and material zones, with a single truss frame and grey PVC cover.

Grey PVC122.632 m² nominal
Indicative price · roof kit onlyNZ$10,000–18,000
View kit →
Original studio concept rendering of a grey PVC container-supported shelter, with a simple arched frame.
Single truss

12.192 × 12.192 m

A broad square roof plan with a single truss galvanised steel frame and grey PVC cover.

Grey PVC148.645 m² nominal
Indicative price · roof kit onlyNZ$11,500–21,000
View kit →
Original studio concept rendering of a grey PVC container-supported shelter, with a peaked double truss roof.
Double truss peak

18.288 × 12.192 m

A wide double truss peak roof with a grey PVC cover for a planned equipment or storage layout.

Grey PVC222.967 m² nominal
Indicative price · roof kit onlyNZ$22,500–40,500
View kit →

Request a current NZD quote for the exact configuration, with GST, delivery and unloading stated separately. Renderings illustrate the kit type; the selected model’s documents define the final assembly.

Nominal size and usable space

Match your equipment and access route to the selected model’s drawings.

Roof width × length

The kit label gives its nominal roof plan. Use it to compare sizes and plan area.

Space between supports

Container spacing and attachment locations come from the exact model’s mounting layout.

Finished entry opening

Check clear width and height with the roof profile, end walls and door hardware in place.

Bring your equipment dimensions

Include mirrors, attachments, raised components, turning space and room to work. Have the support-container height, condition and mounting arrangement checked with the exact roof.

Choose the shelter around what happens inside

Measure the equipment and its route through the bay, then include the room needed to park, work and retrieve materials.

Vehicles & equipment

Include mirrors, attachments, raised components and handling equipment. Compare the full operating envelope with the entry and arch profile.

Materials & yard storage

Lay out racks, stacked loads, aisles and loading space. An open roof provides overhead cover; weather protection at the sides depends on the enclosure options.

A covered work area

Allow for workers, machinery, lighting and utilities in the proposed layout. A fabric roof alone does not establish an insulated or climate-controlled workspace.

Separate the roof kit from the complete project

Get a written parts list and description of each installation job. A roof-kit price is not the price of a complete building.

Frame, cover & fittings

Confirm the exact frame configuration, cover material and attachments supplied with the selected model.

Containers, mounts & foundations

Supporting containers are separate. Include existing containers so their condition and mounting compatibility can be assessed.

Delivery, unloading & assembly

Plan kit freight, container delivery, unloading and assembly as separate services.

End-wall and door requests

Choose open ends or request enclosure on the product page. Confirm matching end walls, doors, availability and opening sizes in the quote.

Cover, containers and assembly

The selected PE or PVC cover appears on each kit. Request supporting containers and assembly separately when you need them.

Coordinate roof and container deliveries

Roof kits arrive as packed parts. Arrange transport and placement for the supporting containers separately, and confirm both jobs with those responsible.

Verify the shipment

Ask for current crate dimensions, weights, number of packages and unloading instructions for the exact kit. Confirm access, lifting capacity and who supplies the unloading equipment.

Prepare the supports

Agree on the foundations, level, spacing and mounting references before placement. Use the selected model’s installation drawings rather than the nominal width in the product name.

Schedule assembly

Ask the installer for the crew, equipment, sequence and project duration after reviewing the model and site. Include access, weather conditions, enclosure work and any required inspections.

Model and site documents

Choose the configuration and enclosure first, then have the complete support system assessed for the site. A generic advertised wind speed or snow figure does not establish the design of your installation.

  • Model and revision of the roof, mounting and installation drawings
  • Design criteria for the address, exposure, wind and snow, including drift where relevant
  • Container condition, attachments, anchors and foundations included in the design
  • Effect of the selected end walls, openings and equipment layout
  • Documents and reviews required by the local authority
  • Written operating limits and procedures from the model-specific manual
Assembly, cover care and warranty

Keep the matching assembly and care manual, inspection schedule and replacement-cover reference. Confirm the written frame and cover warranty for the exact configuration.

Questions before ordering

What is a container shelter?

In this category, a roof spans a bay between two supporting shipping containers. The containers form the side supports; the covered bay sits between them. Specify whether you want open ends, partial walls or enclosed ends.

Is the roof width the gap between containers?

The size label describes the nominal roof plan. The container gap, mounting points, clear entry width and inside height require the selected model’s support and opening drawings.

Can I use my existing containers?

Have their length, height, condition, placement and mounting compatibility checked for the exact roof. Confirm whether the design accepts standard or High Cube boxes and the required attachment method.

Are the supporting containers and end walls included?

The five configuration examples describe roof formats. Confirm supporting containers and end walls as separate items in the actual supplier quote, with a written bill of materials, inclusions and exclusions.

What does a shipping container roof kit cost?

Request a current NZD quote, with GST and the complete scope stated.

Will a wider or double truss kit suit local wind and snow?

Select from model-specific documents for the site and complete support system. Width or the phrase double truss does not establish a wind or snow rating. Include foundations, attachments and enclosure options in the assessment.

Describe the whole shelter, from roof to ground

Add your delivery postcode, use, equipment dimensions, roof size, available containers, wall and door options, site access and timing. Review the completed brief, then send it through the quote form with your consent, or copy or download it.

Prepare my project request