Plan the site in Tasman
A Tasman request should identify the actual locality and terrain. A sheltered lowland site and a mountain or exposed coastal property need different access, drainage and design checks. Ask for the route and installation scope in writing.
Record the access road, final support points and drainage at the property, particularly for a rural or sloping site. If the unit is for a workshop, cabin or additional dwelling, decide the services and council requirements before ordering. Confirm any cross-island transport separately from the purchase.
Ask for the complete Tasman delivery scope
- Give the four-digit postcode and the actual delivery address, not only the town centre.
- Name the dispatch point, container length, empty or loaded condition, vehicle and unloading method.
- Ask for transport, placement, GST and any waiting or difficult-access charges on separate lines.
- If the unit must travel between the North and South Islands, confirm the transfer route, booking responsibility, extra handling and transport timing.
Match the permission check to the proposed use
A storage shell, converted workplace, refrigerated facility and dwelling can require different building, planning and utility checks. Discuss the particular site and intended use with the local council before ordering permanent foundations or a fit-out. A supplier’s container description does not establish council approval.
