DOUBLE TRUSS PEAK / GREY PVC

18.288 × 12.192 m Nominal Container Shelter

Plan a covered bay around your equipment, daily access and New Zealand site conditions. Nominal roof formats below are comparison concepts; request a locally supplied design, matching mounts and support containers, and a full NZD quote with GST and installation scope stated.

NZ$22,500–40,500

Indicative price. Prices in NZD, including 15% GST. Prices cover the conversion or kit described. Supporting containers, additional fit-out, site work, transport and installation are quoted separately.

  • Exact NZ supply configuration
  • Cover material and colour to confirm
  • Supporting containers and site work to itemise
MAKE ROOM FOR YOUR PROJECT

Plan a wide 60 × 40 ft peak-roof operation

A wide roof is useful when you can name the work that needs the span: large equipment access, parallel operations, or separate receiving and storage. Start with those activities and the peak-roof profile, then ask for a coordinated support and installation proposal.

The concepts below keep routes separate from fixed working areas and show why the whole site needs planning. Containers, approach space, drainage, unloading and temporary assembly space extend beyond the nominal roof outline.

How to use these concept plans

Concept layouts for a 60 × 40 ft nominal double-truss peak roof. Confirm the exact peak model; nominal width, ridge height and double-truss wording do not define usable clearance or structural capacity.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

Large equipment with service zones

Bring the equipment in from the open front and park it in the central position, with separate service areas at its sides. Keep the front approach free while the machine is in place: the occupied equipment position is not a through lane. Draw raised attachments and removed components against the actual roof profile and identify any separate lifting or service installation.

60 × 40 ft nominal container-supported roof
Large equipment with service zones — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Check clearance along the full peak profile, not only the ridge.Open / download this plan
  • 01 · Service zone A
  • 02 · Equipment position
  • 03 · Service zone B
  • 04 · Front approach

Site, equipment and services to resolve

  • Equipment connection schedule
  • Task lighting
  • Any task-specific extraction and waste handling

Ask your quote to cover

  • Space for raised and extended equipment
  • Removed-component space
  • Separate lifting and services plan

No equipment fit, lifting capacity or overhead attachment is implied.

Receiving, sorting and stored materials

Mark a receiving area for incoming loads, keep a central handling route and put longer-term stock farther from the unloading point. Test the busiest situation: a new load arrives while another is being retrieved. Specify the handling machine and protection needed for the stock.

60 × 40 ft nominal container-supported roof
Receiving, sorting and stored materials — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
The central route is not a calculated traffic or turning lane.Open / download this plan
  • 01 · Receiving and sorting
  • 02 · Handling route
  • 03 · Stored materials

Site, equipment and services to resolve

  • Receiving and stock lighting
  • Surface and runoff brief

Ask your quote to cover

  • Maximum inbound load
  • Handling machine and space to turn
  • Enclosure and finished door openings

Ground and rack design must address the actual equipment and loads.

Parallel work areas with a protected rear area

Separate two working areas with a central movement route and use the rear for support tasks or materials. Where weather screening is required, request a compatible rear closure and describe the activities beside it. Check ventilation and conflicting movements before treating the plan as an enclosed operation.

60 × 40 ft nominal container-supported roof
Parallel work areas with a protected rear brief — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
A rear closure is a design request rather than an included end wall.Open / download this plan
  • 01 · Work area A
  • 02 · Central route
  • 03 · Work area B
  • 04 · Rear support zone

Site, equipment and services to resolve

  • Separate work-area service lists
  • Task lighting
  • Ventilation requirements for the proposed closure

Ask your quote to cover

  • Both activity descriptions
  • Simultaneous equipment use
  • Rear closure request and door positions

Parallel activities require their own space and service assessment.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

Plan and erect a 60 × 40 ft double-truss peak shelter

Plan the peak-frame assemblies, support plates and wide-area lifting from the exact selected model. Match the ridge and cover orientation before installation, then complete the braced frame and progressive cover tensioning without borrowing parts or sequences from an arched-roof kit.

Before delivery and roof assembly

  • Identify the actual peak-roof model, revision and matched cover.
  • Review the whole roof, enclosure, support, anchor and foundation system for the site.
  • Agree the wide-assembly staging, lifting method and temporary stability before delivery.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched peak double-truss frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    Double truss describes a frame type, not a complete ridge and mounting specification.

    • Cross-check the peak drawing, paired truss segments, left/right base plates and cover label.
    • Separate specified high-strength fasteners, purlins, brace clips and joint-protection parts by assembly position.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    Wide mounting references and temporary assembly space both control the installation.

    • Survey the exact base-plate references, both support levels and full-layout diagonals.
    • Mark full truss assembly, lifting plant positions, access restrictions, cover staging and runoff on the site plan.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Complete the site-designed foundations and support anchorage before the roof structure is raised.
    • Verify the supplied containers and support connection details against the complete peak-roof design.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    Wide double-truss systems can use model-specific corner and intermediate plates.

    • Identify each plate position and orientation from the peak model’s drawing.
    • Have the responsible trade complete the specified bolted or welded connection and required protection; inspect before loading.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Inspect every paired-frame connection, purlin row, brace, plate and end detail against the peak drawing.
    • Install the prescribed joint tape, caps or other fabric protection; keep any proposed suspended loads outside this roof-only scope unless designed.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    The large peak cover must match the ridge and remain controlled during deployment.

    • Verify the actual ridge orientation, pockets and pulling points on a clean protected staging surface.
    • Use the manufacturer’s handling method and working weather limits, maintaining coordinated control without over-pulling one side.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Fit only the peak model’s specified tension tubes, lacing, side straps and corner attachments.
    • Centre the cover at the ridge and ends before completing the actual progressive tensioning sequence.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    The completed wide structure needs recorded inspections and instructions for use.

    • Record the full support-to-roof inspection, cover profile and any reviewed end-wall/door configuration.
    • Demonstrate access and give the operator the actual model’s inspection, retensioning, repair and weather procedures.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Plan how to use the wide bay

List the activities that must happen at the same time and show the largest equipment position for each. Keep access to support-container doors and the open yard visible on the same plan.

Request the exact peak profile

Ask for the inside roof outline, bracing, mounting references and finished entrance. Place high equipment at its real side position and along its travel route, not only under the centre of the ridge.

Coordinate supports and the site design

Have the proposed roof, mounting, containers, anchors and foundations considered together for the site. State enclosure options and future changes now so the assessment addresses the requested installation.

Reserve an installation and lifting area

Agree where parts can be stored and assembled before lifting. Ask the installer to show equipment access, areas to keep clear and the order of work, especially if the rest of the yard must stay open.

Design decisions worth resolving early

Match the peak frame and its support connections

Request the exact peak-roof frame, base-connection and erection drawings together. Use their marked assembly positions when planning delivery, ground assembly and lifting. A curved-roof diagram does not identify the parts or mounting positions of this peak option.

Compare actual profiles rather than a ridge number

The ridge is one point in a roof section. The supplier's drawing should show where clear height reduces toward the sides and how end-wall framing affects equipment movement.

Keep hung services and loads explicit

List proposed lights, ducts, cable supports or suspended equipment before the design is agreed. Do not use the roof as an assumed support for a hoist, crane or storage system.

Treat future closure as a project change

Tell the supplier from the start if you may enclose both ends later. Plan matching panels, doors, ventilation and the overall design together. Do not assume end walls can simply be added afterwards.

Compare the complete wider alternative

Against a smaller roof, compare support and ground works, freight, lifting, assembly and ongoing access as well as kit supply. A wide roof may need a different installation sequence even when the nominal length stays the same.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • Exact double-truss peak model and profile drawing
  • Equipment travel and full operating heights
  • Concurrent activities and reserved access route
  • Support containers, mounts, anchors and foundations
  • Enclosure and finished opening requirements
  • Unloading, assembly staging and lifting access
  • Installed services and any proposed suspended items
  • Model documents, itemised work and handover responsibilities

Project questions

Does double truss guarantee a higher wind or snow rating?

The name alone does not give the installation a rating. Ask for the selected model's documents and a site assessment covering the roof, enclosure, supports, anchors and foundations.

Can tall equipment use the whole width?

Check the inside peak profile at each equipment position and along the route through the finished end opening. A ridge height does not state the clearance beside the supports.

Can I install a crane or hoist beneath it?

Give the designer a separate lifting proposal showing loads and operating positions. Do not attach lifting equipment to a roof kit unless the complete arrangement has been designed for it.

How much extra site space should I allow for installation?

Ask the appointed installer to mark it on the site plan after reviewing the selected kit and lifting method. Show unloading, component staging, assembly, machine access and the area kept clear during lifting; the nominal roof footprint cannot answer this alone.

Plan your configuration

Choose what to include in the quote. Options are priced separately after model and site confirmation.

Specifications

Nominal comparison width
18.288 m
Nominal comparison length
12.192 m
Nominal roof plan
222.967 m²
Frame and cover
Confirm the locally supplied system
Design duty
Exact NZ site loads and engineer review
Finished opening
Obtain the model drawing

What the base kit covers

ItemScopeDetails
Roof frameConfirmAsk the local supplier to list the exact design and included parts in the quote.
Roof coverConfirmAsk the local supplier to list the exact design and included parts in the quote.
Mounting hardwareConfirmExact feet, bracing, fasteners and anchors on the packing list.
Supporting containersSeparateExisting containers or separately supplied supports.
End walls & doorsSeparateModel fit, availability and finished opening to be quoted.
Freight & installationSeparateDelivery postcode, unloading, site work, assembly and GST.

Plan the wide bay as a complete system

Start with the equipment layout, then match the peak roof, support arrangement and enclosure to the site. The larger nominal plan alone does not define usable clearance.

List the busiest-time needs clearly

This configuration has a peak roof. Use a matching inside profile to check your load along its full route, including the end opening and side positions.

Allow room for the build

Agree the assembly method, lifting equipment, temporary working area and support preparation with the supplier and operator. Include those activities in the site plan and quote; the nominal roof footprint does not describe the full assembly area.

Compare the whole scope

The 12.192 × 12.192 m single truss alternative is nominally narrower and has a different frame. Compare supports, mounts, documents and assembly alongside the kit price.

18.288 × 12.192 m nominal comparison plan

This is the metric equivalent of the nominal format label. The dimensions do not define a certified NZ model, actual container gap or clear entry; request the selected supplier’s assembly and mounting drawings.

Nominal roof plan
222.967 m²
Width basis
Concept label only
Clear opening
Exact offered model drawing
Support spacing
Approved NZ mounting layout

Delivery and assembly

Roof-kit freight and container delivery are separate. Use the exact shipment and site layout to plan both.

Packed kit

Request the exact packed shipment count, metric dimensions and kilogram weights. Agree on unloading equipment and safe assembly access for the actual kit.

Site and supports

Prepare the ground levels, drainage and access. Match the container arrangement, attachments and foundations to the selected roof.

Unloading and build

Agree who supplies lifting equipment and assembles the kit. Check truck access, the order of assembly and which delivery work is included.

Assembly, care and warranty

Ask for and keep the documents for the exact frame and cover you are buying.

Assembly and parts

Matching assembly manual, complete parts list and support/mounting drawing.

Cover care

Model-specific tensioning, inspection and weather procedures, plus the correct replacement-cover reference.

Written warranty

Coverage for the frame and cover, exclusions, start date and claims process. A material lifespan label does not define a warranty.

Compare other kits

Compare all shelter sizes

Compare the five nominal roof sizes, frame configurations and items to include in a current NZD quote, with GST stated.

Questions

How should I check equipment clearance under the peak roof?

Use the exact peak-roof drawing to check the inside profile across the bay and the finished entrance. Include raised equipment, attachments and any end-wall door. The nominal 18.288 m roof width and outside ridge height do not establish clear space at every position.

Can I change the cover or add end walls?

State the cover material, colour and enclosure you need in the request. Confirm compatible cover, end-wall and door parts for the actual offered model, with finished opening dimensions and any price change.

What do I need for an installed price?

Add your delivery postcode, supporting containers, wall and opening requirements, access and assembly scope. The quote should separate kit supply, freight, unloading, supports, site work, installation and GST.

Build your request around this kit

Add site location, measured equipment/access requirements, existing containers, preferred enclosure and the complete installation scope to the request.

Prepare my quote