SINGLE TRUSS / GREY PVC

33 × 40 ft Container Shelter

A deeper roof plan for equipment and material zones, with a single truss frame and grey PVC cover.

A$7,500–13,500

Indicative price. Prices in AUD, including 10% GST. Prices cover the conversion or kit described. Supporting containers, additional fit-out, site work, transport and installation are quoted separately.

  • Frame material and finish to confirm
  • Cover material and colour to confirm
  • Supporting containers: quote separately
MAKE ROOM FOR YOUR PROJECT

Organise a 33 × 40 ft shelter around retrieval and flow

The longer nominal roof plan can do more than hold a larger pile of equipment. It can separate receiving, stored materials and retrieval, or keep a work zone beside a route through the bay. Sketch those movements before deciding where an end wall belongs.

The three layouts use the same roof size for different jobs. Each keeps a clear route through the space and gives the remaining area a purpose. Include the supporting containers and any outside loading area in the site plan.

How to use these concept plans

Concept layouts based on a 33 × 40 ft roof label. A model sold under this label may use a rounded metric frame; use its exact installation drawing for all site dimensions.

Explore three ways to arrange the space

Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.

Through-access equipment shelter

Reserve a continuous route from one end to the other and keep parked equipment beside it. This can help a yard where reversing or unloading at one entrance is awkward. Show the external approach at both ends and check that a parked attachment cannot intrude into the route.

33 × 40 ft nominal container-supported roof
Through-access equipment shelter — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
The central route is a planning reservation, not a specified traffic lane.Open / download this plan
  • 01 · Equipment positions
  • 02 · Through route
  • 03 · Accessories

Site, equipment and services to resolve

  • Route and task lighting if required

Ask your quote to cover

  • Both end approaches
  • Equipment widths and operating heights
  • One-way movement plan

Number and size of equipment positions are to be established from measured envelopes.

Receiving, stock and picking

Keep stock along one side, retain the central picking aisle and use the front corner on the opposite side for receiving and sorting. Draw the largest incoming load in that corner before it is moved to storage. Check that a waiting delivery leaves the aisle and front approach usable.

33 × 40 ft nominal container-supported roof
Receiving, stock and picking — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
Incoming goods and stored goods are separate zones in the brief.Open / download this plan
  • 01 · Stock
  • 02 · Picking aisle
  • 03 · Receiving

Site, equipment and services to resolve

  • Picking lighting
  • Surface suitable for selected handling method

Ask your quote to cover

  • Delivery load size
  • Rack or stack arrangement
  • Handling equipment and weather protection

Stock volume, handling method and rack design are not set by the nominal roof area.

Maintenance position with separate parts staging

Mark where the machine will work. Leave a path beside it and room for parts at the rear or in a support container. Include space for removed components. Describe lifting, fluids, exhaust and hot work separately so the supplier can assess whether the roof and workspace suit those tasks.

33 × 40 ft nominal container-supported roof
Maintenance position with separate parts staging — Concept zone plans for comparing equipment, storage and access. Develop the chosen arrangement with the roof supplier and site designer using the actual roof, mounting and support drawings.
Swipe across the plan to explore it on a small screen.
No lifting equipment or roof-hung load is included in this concept.Open / download this plan
  • 01 · Maintenance position
  • 02 · Access
  • 03 · Parts staging

Site, equipment and services to resolve

  • Task power and lighting
  • Any task-specific extraction
  • Fluid-management requirements if relevant

Ask your quote to cover

  • Tasks and equipment list
  • Removed-component sizes
  • Any separate lifting design
  • Waste and service requirements

The diagram does not specify lifting capacity, a vehicle lift or suitability for particular servicing work.

PLAN THE SUPPORTS AND ROOF ASSEMBLY

Assemble a 33 × 40 ft shelter along a coordinated long rail run

The longer roof needs numbered frame stations, organised rail joints and coordinated cover handling. Mark the actual support references and end approaches first, then group members and hardware by their installation position so an early error is not repeated along the run.

Before delivery and roof assembly

  • Confirm support length and rail layout against the exact 40 ft-length roof model.
  • Keep equipment approaches at both ends visible before choosing enclosure.
  • Prepare a staging strip for long members and the folded roof cover.

See the build sequence

From support layout to a tensioned roof — Five-stage overview of the construction sequence
Swipe across the drawing on a small screen.

Compare these assembly steps with the manual for your actual kit. Connections, temporary supports and cover tensioning depend on the model.

Open / download the construction roadmap
Materials and how to estimate quantities

Use the packing list for the selected roof kit. Confirm support and fixing components separately, and count any optional end walls or doors.

Materials and how to estimate quantitiesHow much to allowChoose for your design
Compatible supporting containers

Provide the selected roof’s support lines.

Use the approved support layout and actual container dimensions.Check length, height, condition and attachment compatibility; do not assume every box accepts the same clamp.
Designed foundations and anchors

Connect the complete roof/support system to the ground.

Use the site-specific foundation and anchor schedule.Match ground conditions, support forces and enclosure; a container’s weight is not an anchoring design.
Matching base rails or mounting plates

Locate the frame on its designed mounting references.

Count the correct left/right and intermediate pieces from this kit’s parts list.Use the selected bolted, clamped or welded detail; do not combine mounting systems.
Matched single-truss frame members

Form the selected roof profile.

Sort every frame segment by its part mark and the model-specific bay count.Match crown, side and end pieces to the exact model and revision.
Purlins and bracing members

Join adjacent frames and complete the specified braced system.

Count all rows, end details and special bays on the assembly drawing.Keep connection brackets and clips with the matching member.
Specified fasteners, caps and joint protection

Complete connections and protect the roof fabric.

Reconcile the packing list by size and part code, including protection tapes where supplied.Do not replace missing grades, washers or covers with unconfirmed hardware.
Model-matched roof cover

Cover the completed frame.

Use the cover identified for this roof, including its orientation and pockets.Confirm PE or PVC, colour and replacement reference; another material is a separate specification.
Tension tubes, straps, ropes and ratchets

Secure and tension the cover in the designed positions.

Match pockets, end lacing and corner attachments to the exact cover drawing.Distinguish cover-pulling ropes from rated lifting gear; they are not interchangeable.
Matched end-wall or door kit, if selected

Complete the agreed enclosure option.

Count only the approved enclosed ends and matching opening parts.Before assembly, have the complete kit, its supports and its design checked together.
Tools and equipment
  • Tape, set-out strings and marked drawing

    Set mounting references and check diagonals from the selected drawing.

  • Level or surveying equipment

    Record support elevations and rail alignment.

  • Part labels and inventory sheet

    Group frames, purlins, braces and hardware by bay and part number.

  • Correct sockets, spanners and specified torque tool

    Make the manufacturer’s connections and record the required tightening checks.

  • Planned lifting equipment and rated accessories

    Unload and raise the actual assemblies using the lifting plan.

  • Suitable work platform and temporary bracing equipment

    Reach the connections and stabilise incomplete frames in the planned sequence.

  • Specified drilling or welding equipment, only if required

    Complete the selected mounting detail with the responsible trade.

  • Cover-handling protection and task PPE

    Keep the fabric clear of sharp edges and protect workers during the planned tasks.

Work through the build in this order

  1. 01 Identify the kit and inventory the parts

    Repeated bays make an early part mix-up recur along the roof.

    • Check the selected frame’s actual dimensions, drawing revision and repeated-bay parts against the shipment.
    • Bundle rail joints, purlins and brace clips by their marked position rather than by visual similarity.

    Check before the next stage: Model, revision, parts and unresolved shortages are recorded.

  2. 02 Set out the supports and work area

    A small rail-line error can be repeated across many frame positions.

    • Mark the exact support references and check diagonals for the whole long bay.
    • Record levels at mounting stations along both supports and retain the receiving/retrieval approaches.

    Check before the next stage: A marked layout records the reference faces, diagonals, levels and approach space.

  3. 03 Place and secure the supporting system

    The roof cannot be stabilised by unverified support weight alone.

    • Prepare the designed anchors and place the accepted long supports before rail installation.
    • Recheck straightness, level and reference spacing after securing the containers.

    Check before the next stage: Supports and anchorage are accepted before roof erection.

    Work to coordinate with the relevant trade: Foundation, anchorage and lifting decisions use the responsible designer and installation team.

  4. 04 Install the matching mounting components

    Long rails must follow the correct segment and connection sequence.

    • Assemble the marked rail segments and joint plates in the supplied order on each side.
    • Verify end attachments, intermediate mounts and frame positions before any arch is raised.

    Check before the next stage: Mount locations, orientation and connection checks match the selected drawing.

  5. 05 Prepare and check the planned frame assemblies

    Correct part identity, orientation and permitted assembly size must be established before a lift.

    • Lay out the marked members in the selected roof profile and group the fasteners and clips for that assembly.
    • Assemble only the sections shown in the erection plan. Check joint orientation, required pre-installed clips and specified fastener checks; label the completed assembly and confirm its planned handling before lifting.

    Check before the next stage: Each planned assembly is identified and its joints, handling and temporary-restraint requirements are checked before lifting.

  6. 06 Erect and connect the first stable bay

    The incomplete structure needs its planned temporary stability.

    • Lift only the prepared assembly specified for this stage, using the planned handling positions, rated equipment and temporary restraints. Secure the connections required at its supports before progressing.
    • Make the scheduled purlin and bracing connections in the first bay. Check the specified fixings and temporary stability before adding the next assembly or releasing any restraint.

    Check before the next stage: The erection lead confirms stability and connections before the next bay is added.

    Work to coordinate with the relevant trade: Use the lift plan, appropriate access and controlled work area; do not climb unsupported frames.

  7. 07 Complete bracing and inspect fabric contact points

    Fabric should meet a completed, checked frame rather than exposed sharp hardware.

    • Walk the full length to check repeated purlin connections, diagonal braces and end details.
    • Confirm that every fabric-contact line is smooth or has the kit’s specified protection.

    Check before the next stage: Frame alignment, bracing, fasteners and protective details are signed off before covering.

  8. 08 Spread and centre the roof cover

    A long cover needs coordinated handling at both ends as well as across the span.

    • Lay out the long sheet with its end orientation and pockets checked before pulling.
    • Use the planned pulling stations to keep it even, controlled and clear of snags; check equal end overhangs.

    Check before the next stage: The correctly oriented cover is centred and controlled at every stage.

  9. 09 Secure edges and tension in the kit sequence

    A centred cover and the correct attachment pattern are prerequisites for even tension.

    • Fit matching tension tubes and complete the manufacturer’s end-lacing and strap arrangement.
    • Work through the prescribed tensioning order along the whole roof instead of fully tightening a single corner first.

    Check before the next stage: Pockets, lacing, straps, corner attachments and the cover profile pass the final check.

  10. 10 Inspect the complete installation and start the care record

    Repeated connections and retrieval routes must both survive the finished installation.

    • Record the final checks bay by bay, including mounts, braces, lacing and the full roof edge.
    • Demonstrate both approaches or the chosen single-end route and schedule the kit’s periodic checks.

    Check before the next stage: The handover documents include inspection and weather instructions for the actual kit.

Mistakes that create rework

Spacing containers from the roof name

Use the installation drawing’s exact reference faces and mounting points. Nominal roof width is not automatically a clear gap.

Raising several unbraced frames

Follow the planned first-bay stabilisation and connection sequence before extending the run.

Tensioning the fabric before it is centred

Check orientation, pockets and end overhangs before final tension. Never use higher tension to hide a misplaced cover.

Adding enclosure as an unreviewed later accessory

End walls and doors need matching parts and review of the complete installation.

Checks before putting the space into use

  • Exact model, cover reference, drawing revision and parts record.
  • Recorded support levels, mounting positions and foundation/anchor checks.
  • Frame, purlin, brace and connection inspection before the cover hides them.
  • Cover orientation, tension and matching end-wall/door checks.
  • Model-specific inspection, retensioning, care and weather procedures.
  • Written unresolved items, responsible contacts and replacement-cover details.

Make the layout work in daily use

Choose the route that must remain open

Use a through route when both ends can be approached; use a front receiving arrangement when only one end is accessible. Draw the site boundary and nearby obstructions before selecting the end-wall configuration.

Make stock retrieval visible

Write the order in which items arrive and leave. Place frequently used goods where they can be retrieved without moving long-term storage, and show where the handling machine waits during loading.

Get the actual mounting layout

Request support spacing, container orientation, attachment points and the exact frame revision together. Use that coordinated layout to position foundations and supporting boxes.

Plan the working installation area

The finished roof outline is not the assembly area. Agree where the long components are unloaded, laid out and lifted, and how normal yard traffic will be separated from the assembly work.

Design decisions worth resolving early

Use the actual frame drawing for the long bay

The 33 × 40 ft outline is a nominal comparison. Confirm the selected roof’s manufactured width and length, rail joints and frame stations on one drawing before placing the supports. A similarly named kit is not a substitute for that drawing.

Check levels along the whole support line

Record mounting levels at the stations shown on the actual drawing, rather than checking only the four ground corners. Keep runoff paths and both end approaches on the site plan so a long roof does not block drainage or retrieval.

Separate storage from equipment operation

An item that fits while parked may take more space with a door, attachment or workpiece extended. Check those operating positions beside the access route and under the actual arch profile.

Specify which container doors matter

A supporting container may hold tools or stock used throughout the day. Include door opening and the route to it, especially where an end wall, rack or parked machine sits nearby.

Tell the supplier what you need

Choose a layout, then send the equipment sizes, support details and site conditions. Separate roof supply, supports, ground work, delivery, lifting and assembly in the offer.

Discuss my project →
  • One-end or through-access operation
  • Equipment envelopes and stored-load sizes
  • Site approaches and nearby obstructions
  • Exact roof model and dimensioned support layout
  • Support-container condition and planned anchoring work
  • Surface and drainage responsibility
  • Installer unloading, staging and lifting access

Project questions

Which dimensions should set the support spacing?

The supplied model’s drawing should set the support references, manufactured width and length, and the finished clear opening. Do not set support spacing from the nominal size label.

Can I use both ends for vehicle access?

Request an open-end arrangement and check the approach and inside profile at both ends. Include equipment height and width in operating positions. Any later end wall or door changes the route and needs a matching design.

Can racks or tools be attached to the roof frame?

Include every proposed attachment or suspended load in the original design. A roof-only kit does not automatically allow you to hang storage, services or lifting equipment from it.

When is the 40 × 40 ft option worth comparing?

Compare it when the longer depth is useful but stock, machinery and access still conflict across the width. Put the same equipment on both layouts and compare finished clearances and total installed scope.

Plan your configuration

Choose what to include in the quote. Options are priced separately after model and site confirmation.

Specifications

Nominal roof width
10.06 m
Nominal roof length
12.19 m
Nominal roof plan
122.6 m²
Frame
Single truss
Frame material
Confirm the offered material and protective finish
Selected cover
Confirm the offered material, colour and product reference

Scope to confirm for this configuration

ItemScopeDetails
Roof frameTo specifySingle truss galvanised steel configuration.
Roof coverTo specifyGrey PVC cover for this base configuration.
Mounting hardwareConfirmExact feet, bracing, fasteners and anchors on the packing list.
Supporting containersSeparateExisting containers or separately supplied supports.
End walls & doorsSeparateModel fit, availability and finished opening to be quoted.
Freight & installationSeparateDelivery postcode, unloading, site work, assembly and taxes.

Lay out a longer covered bay

The 10.06 × 12.19 m (33 × 40 ft) roof provides a different starting plan from the short kits. Place the access route and storage zones on the same drawing.

Separate access from storage

Lay out parked equipment or material zones along the nominal length. Keep the retrieval route visible so a stored item does not block another item’s exit.

Check both end approaches

Show the space needed to approach and leave the bay at each end. Any end wall or door changes that route and needs its own finished-opening dimensions.

Compare at the same length

The 12.19 × 12.19 m (40 × 40 ft) single truss kit keeps the same nominal length and adds 2.13 m of nominal width. Compare the layout and full installed scope before moving up.

Nominal roof dimensions: 10.06 × 12.19 m

10.06 m wide × 12.19 m long gives a 122.6 m² nominal roof plan. Confirm the usable container gap, entry opening and inside roof profile on the exact model drawing.

Nominal plan
122.6 m²
Width basis
Nominal roof label
Clear opening
Exact model drawing
Support spacing
Exact mounting layout

Delivery and assembly

Roof-kit freight and container delivery are separate. Use the exact shipment and site layout to plan both.

Packed kit

Obtain the selected kit’s package count, weights and dimensions before arranging freight or unloading.

Site and supports

Prepare the ground levels, drainage and access. Match the container arrangement, attachments and foundations to the selected roof.

Unloading and build

Agree who supplies lifting equipment and assembles the kit. Check truck access, the order of assembly and which delivery work is included.

Assembly, care and warranty

Ask for and keep the documents for the exact frame and cover you are buying.

Assembly and parts

Matching assembly manual, complete parts list and support/mounting drawing.

Cover care

Model-specific tensioning, inspection and weather procedures, plus the correct replacement-cover reference.

Written warranty

Coverage for the frame and cover, exclusions, start date and claims process. A material lifespan label does not define a warranty.

Compare other kits

Compare all shelter sizes

Compare the five illustrated roof sizes, frame designs and cover options. Then ask Australian suppliers for current quotes that include the same complete kit and work.

Questions

How does 33 × 40 ft compare with 26 × 20 ft?

Put the same incoming load, stock and handling route on both nominal layouts. Use the longer option where receiving and retrieval need separate positions, then compare the actual clear openings and complete supplied scope. Do not assume a shared size family means identical covers or mounts.

Can I change the cover or add end walls?

State the cover material, colour and enclosure you need in the request. Confirm compatible cover, end-wall and door parts for the actual offered model, with finished opening dimensions and any price change.

What do I need for an installed price?

Add your delivery postcode, supporting containers, wall and opening requirements, access and assembly scope. The quote should separate kit supply, freight, unloading, supports, site work, installation and taxes.

Build your request around this kit

10.06 × 12.19 m (33 × 40 ft) · Single truss · Grey PVC. Add your site details and the options you selected.

Prepare my quote