| Designed door/window frames and connections Support the new openings. | Take quantities from the approved structural opening schedule. | Include roof or wall equipment supports where required. |
| Windows, door hardware, flashings and seals Provide daylight, entry and weather closure. | Measure manufactured apertures and count the selected hardware. | Choose glazing, shading and access details for the site and occupied use. |
| Compatible steel coating system Protect repaired steel and new connections. | Measure prepared area and edge lengths to the specified coating schedule. | Confirm compatibility and exposure with the coating supplier. |
| Floor repair and finished-floor assembly Create a sound base and the agreed finished level. | Measure floor area and any partitions or concentrated storage loads. | Choose the verified substrate and suitable build-up, not merely a finish over damaged boards. |
| Framing, insulation and specified air/moisture layers Form the occupied thermal enclosure. | Measure walls, roof, floor and reveals separately. | Choose a climate-specific assembly with resolved metal bridges and service penetrations. Compare mineral wool in a supported frame with a specified rigid PIR-board or panel system only where its fire/heat performance and condensation design suit the use; follow the selected system as a whole. |
| Interior partitions, linings and acoustic details Separate work or meeting areas as actually required. | Set out partitions, sheets, doors and junction lengths from the finished plan. | Specify privacy and fire performance of the complete assembly, not the panel face alone. |
| Ceiling/access system where selected Finish overhead work while keeping services maintainable. | Count grid, supports, panels and service access from the ceiling plan. | Use a compatible supported system and preserve the required clear height. |
| Electrical, data, lighting and comfort components Serve desks and the occupied rooms. | Count points, loads and routes from the furniture and room schedule. | Qualified trades select supply, protection, ventilation and HVAC for the site. |
| Furniture, storage and fixation hardware Complete the working room and any relocation package. | Order the exact approved furniture sizes and restraints. | Check open doors/chairs and support loads, especially tall storage. |