| Inspected container shell The measured starting structure. | Select the unit count from the agreed single- or multi-module plan. | Record repairs, floor condition, previous modifications and known cargo history. |
| Designed opening frames and support steel Support the altered shell and its openings. | Use the engineer’s member and connection schedule, not a generic frame size. | Order the specified steel, corrosion protection and connection system together. |
| Doors, windows and flashing components Complete access and weather detailing. | Count the opening schedule and measure the perimeter of each selected frame. | Confirm finished clear openings, hardware, sill drainage and compatible sealants. |
| Cleaning and corrosion-coating system Prepare exposed steel and repair damaged protection. | Divide measured coating area by the selected product’s practical coverage for the specified coats. | Match steel or galvanising, existing coating, preparation standard and recoat conditions. |
| Specified mineral-wool, PIR-board or other insulation assembly Fit the agreed insulation, control layers and supports for fixings. | Measure each wall and ceiling plane, subtract openings, then plan sheet cuts and system-specific losses. | Choose the assembly for climate, moisture and fire requirements. Mineral wool and PIR are options, not interchangeable fixing or air/vapour-control details; verify finished room width. |
| Air seals, gaskets and penetration details Join the selected layers at corners and services. | Measure joint lengths and count actual penetrations from the coordinated drawing. | Check adhesion and material compatibility; a generic foam is not suitable for every joint. |
| Conduit, pipework and first-fix supports Carry the services before closing the linings. | Measure approved routes and count outlets, valves, supports and access panels. | Specify actual equipment demand and local trade requirements. |
| Interior boards and floor finishes Make the space suitable for the activity and cleaning method. | Use a measured board layout and net floor area; include trims and necessary wet-area details. | Confirm substrate, fixing pattern, protection of insulation and moisture exposure. |
| Installed equipment and ventilation components Complete the actual working space. | Count the approved equipment list, including filters, controls and maintenance access parts. | Use manufacturer clearances, service data and replacement dimensions. |
| Compatible fixings, trims and protective details Finish joints and service openings without damaging the insulation or weather seals. | Take off each fixing line and joint from the chosen assembly specification. | Check corrosion compatibility and the permitted fixing substrate. |