Which container minor dwelling option fits your project?
The useful comparison is how much of the dwelling is completed before it reaches the property and who completes the rest.
A floor plan, a cargo container and a finished dwelling are different purchases. Ask for a model-specific specification and a list of exclusions before comparing totals.
| Option | What to establish with the seller | Work to assign separately |
|---|---|---|
| Factory-finished dwelling | The exact residential specification, included systems, factory review documents and condition at delivery. | Site approval, foundations, unloading, installation, utility connections and final inspections unless explicitly included. |
| Shell or partially finished unit | A detailed inventory of structure, openings, insulation, interior work and systems already completed. | Design completion, trades, inspections and a contractor able to finish the dwelling at the property. |
| Custom container conversion | Who designs and documents the residential conversion, where work takes place and who coordinates approvals. | The interface between the conversion team, local contractor, transport provider and site authority. |
Check the property and intended use before selecting a model
Describe whether the building will be a self-contained minor dwelling, a sleepout using the main home’s facilities, visitor accommodation or another use. These choices affect planning, services and the required building documents. Confirm the category for the actual property with the council.
The granny flats building consent exemption can apply to eligible new standalone dwellings up to 70 m² when all current conditions are met. It is not a general approval for every container home below that area. Licensed professionals, Building Code compliance, council notifications and site conditions remain part of the route; planning rules also require their own check.
- Ask the local council’s planning team whether the proposed use and location are allowed on this property, including any setbacks, size limits, easements or other site constraints.
- Ask the building consent authority which plans, inspections and consent or exemption route apply to this specific product and installation.
- Identify water, wastewater and electrical connections, their capacity, and who will assess upgrades.
- Check the proposed placement against access for the delivery vehicle and unloading equipment, landscaping, overhead obstructions and the main house.
- If the project depends on rental income, establish the relevant occupancy and rental rules before relying on that income.
Connect factory documentation with the site approval route
Ask the seller and the site authority to identify the same model, intended occupancy and installation arrangement.
Ask for the exact drawings, structural design, specification and compliance evidence supplied with the proposed unit. Establish which documents cover factory work and which must be prepared for the property, foundations, connections and final use.
Have the council and the responsible professionals confirm whether the current Schedule 1A granny flats exemption can be used or a building consent is required. The October 2026 exemption guidance has changed; an overseas preapproved plan or the word portable does not establish eligibility in New Zealand.
Compare the finished living space
Request dimensions measured to the finished interior surfaces, with insulation, wall linings, service spaces and fixtures included. A container's exterior footprint does not tell you the size of a usable room.
Check the proposed furniture layout, kitchen workspace, bathroom arrangement, storage and paths between rooms. State any accessibility needs early so the designer can assess them with the applicable requirements.
- Ask which appliances, fixtures and heating, cooling and ventilation equipment are included.
- Identify window and door locations on the actual model drawings.
- Ask who reviews the layout for its intended residential use and site conditions.
- Confirm the agreed finishes and systems appear in the purchase specification.
Compare the complete project budget
Ask for separate building and site prices. A cheaper unit may leave more work to finish.
For a septic-served property, establish the additional dwelling's requirements with the relevant local or regional council and a qualified site professional. Have them assess the proposed use, available capacity and site suitability before relying on an installation allowance.
Ask for allowances, exclusions and the method for approving changes in writing. Keep the building purchase separate from any site amount that has not yet been assessed.
| Budget group | Items to identify | Question for the proposal |
|---|---|---|
| Building and documents | The unit, options, design work and required factory or local documents. | Which specification and drawing revision does this amount cover? |
| Property preparation | Site assessment, foundations, drainage, access and any required utility upgrades. | Who prices this work after reviewing the property? |
| Delivery and installation | Transport, unloading, placement, connections and protection during installation. | Who provides each service, and what conditions could change the amount? |
| Completion | Inspections, outstanding finishes, system checks and handover. | What must happen before the dwelling can be occupied? |
Prepare a useful minor dwelling project brief
Include the property town/city, region and postcode; the existing or proposed main dwelling; the intended use; preferred rooms; desired completion level; and what you already know about utilities, access and approvals. List the tasks you need a provider to handle.
Choose Container minor dwelling for Container type and Container home / living space for Intended use in the request form. Describe the residential project and property requirements in the Anything else we should include? field and review the editable summary. Sending through the quote form requires your review and consent.
Buying questions
Does buying a prefab container minor dwelling mean the property is approved?
No. Check the product documents, actual property, intended use, services, foundations and current NZ consent or exemption requirements together. A prefab package or overseas approval does not establish local eligibility.
Can a container guest house be used as a minor dwelling?
Ask the local authority about the planned occupancy and living facilities. The seller's product name does not determine its permitted use. Give the designer and seller the same home requirements.
What should an installed minor dwelling proposal include?
Ask it to name the building specification, design and approval documents, foundations, transport, unloading, placement, utility connections, inspections and final completion work. For every excluded item, identify who will provide it and obtain its cost separately.
Should I choose the model before checking my backyard?
Use a preliminary layout to discuss the project, then establish parcel constraints, services and access before committing to a particular unit. Those findings can change its dimensions, location, completion level and installation scope.
