Compare prefab options by the work completed in the factory and the work required at your site. Start with the building's construction system, finished interior area, equipment and documents. Then define delivery, setting, foundations, connections and final completion so you can compare proposals with the same endpoint.

Prepare a quote request →
Factory-finished container dwelling standing inside a clean workshop.
Illustrative image.
Building identity
Document whether the structure reuses a cargo container or uses another construction system.
Factory completion
List installed work, supplied loose parts and work remaining at the site.
Approval documents
Confirm the applicable programme, current requirements and records for the exact building.
Site installation
Assign transport, unloading, placement, attachments, connections and completion.

Identify the building behind the prefab label

Ask whether the product is made from modified maritime containers, a purpose-built steel module, a folding building system or another structure. Identify the exact supplied and installed configuration; similar marketing labels can describe different construction.

Prefab describes factory production. It does not establish a NZ regulatory category, consent exemption or permission to occupy the property. Provide the actual system, intended use, dimensions and documents to the council and designers, including whether a chassis or relocation arrangement is part of the proposal.

Compare the exact work completed before delivery

Ask the supplier to mark each item complete in the factory, supplied loose, completed on site or excluded.

Define any turnkey claim in writing. Factory completion, delivery to the site and completion of a usable dwelling describe different scopes. The proposal should state the point at which the supplier's responsibility ends.

Part of the buildingFactory information to requestSite interface to define
Structure and enclosureOpenings, connections, roof, windows and sealsSite attachments, joins and remaining weather seals
InteriorInstalled finishes, fixtures and equipmentUnfinished areas, site seams and optional work
ElectricalInstalled equipment, wiring and testing recordsService connection, earthing and final testing
PlumbingFixtures, pipework and water-heating scopeWater and wastewater connections and testing
Heating, cooling and ventilationEquipment installed and work completedRemaining equipment, connections and commissioning
Foundation interfaceSupport loads, dimensions and attachment detailsSite foundation, setting and fastening
RecordsExact plan revision and applicable factory recordsSite review, inspections, corrections and completion records

Verify usable area and transport information

Request a dimensioned plan showing finished interior area, room dimensions, circulation, storage and equipment space. Have the project designer assess the proposed living arrangement and applicable requirements. Exterior dimensions and a sales floor-area figure may use different measurement bases.

Obtain transport dimensions, weight, projections and handling instructions alongside the final installed dimensions. Resolve conflicting figures before designing the foundation, arranging initial delivery or comparing cost per square metre.

Match factory records to the exact project

Separate the factory records from the final-site documents. Ask for the actual building system, drawings and material information, structural design, services specification and inspection records that accompany the supplied unit.

For New Zealand, confirm building consent or the applicable exemption conditions with the council and responsible professionals, as well as any resource consent. Factory completion does not establish approval of the location, foundations, connections or occupancy. Imported preinstalled wiring needs the required NZ electrical assessment, certification and supplier documentation before connection.

  • Match the building identification and plan revision to the order.
  • Distinguish factory checks from site design and installation checks.
  • Confirm how configuration changes affect reviewed documents.
  • Identify records the installer must produce.
  • Assign responsibility for missing documentation and required corrections.

Assign the work between delivery and final completion

Use the actual building and site information for the initial delivery plan. Confirm the foundation and other prerequisites before dispatch, and record where the factory supplier, carrier and site installer each take responsibility.

InterfaceWhat to settle before ordering
FoundationProvide the site designer with support loads, dimensions and attachments; confirm the site conditions.
Truck access and unloadingHave the delivery provider assess access and define the equipment, crew and unloading scope.
Setting and attachmentIdentify who places, aligns and fastens the building to the designed supports.
Weather protectionAssign any site joins, seals and enclosure work needed after setting.
UtilitiesConfirm service availability, connection locations, responsible trades and testing.
CompletionAssign remaining finishes, inspections, corrections and required records.

Agree on checks and correction responsibilities

Agree in writing how to report and fix defects or missing items. Check who handles factory defects, transport damage and installation problems. Name who coordinates a problem involving more than one party.

  • Before release: confirm the ordered specification, approved changes and supplied records.
  • Before dispatch: verify the agreed site and unloading prerequisites.
  • At receipt: check identity, condition and supplied items, and document discrepancies.
  • After setting: check assigned connections, weather seals, equipment and remaining work.
  • Before residential use: confirm the completion and occupancy requirements with the relevant authorities.

Prepare your prefab comparison

Choose Prefab container home for Container type and Container home / living space for Intended use. Describe the dwelling, factory completion level and site requirements in the Anything else we should include? field. Edit the prepared summary to state the factory and site scope you need. Review the summary before sending it through the quote form with your consent.

  • Intended residential use, initial site location and target finished layout.
  • Documented construction system and finished interior area.
  • Required factory completion, installed equipment and finishes.
  • Available approval records and outstanding site reviews.
  • Delivery, unloading, foundation, setting, connections and completion responsibilities.

Buying questions

What does prefab mean for a container home?

It indicates that specified work is performed before delivery, usually in a factory. Ask which construction system is used and exactly what remains to be designed, supplied or installed at the site.

Is a prefab container home automatically classified as a manufactured home?

No. Ask for the actual building system and intended use, then confirm the NZ council route and required documents. Factory-built, container home and portable are marketing or construction descriptions that do not establish approval.

Does factory approval establish permission to place a home on my site?

Check its scope. The project may still need review of land use, site design, foundations, installation, utilities and completion under the applicable jurisdiction's requirements.